BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2025 at 8:00 PM

Updated October 4, 2025

Site work and paving for a civil project in Monterey, California. Completed plans call for site work for a road / highway.

In general, the work consists of, but is not limited to, pavement rehabilitation by way of Full Depth Reclamation (FDR) of approximately 1,656 square yards, excess material off haul and placement of HMA, adjustments of utilities boxes, and installation of traffic markings and striping, including all necessary storm water protection and traffic control measures. The FDR work shall include, but not be limited to, Full Depth Reclamation (17-inch depth) of existing roadway, removal of existing pulverized roadway (5-inch depth), installation of new Hot Mix Asphalt (HMA) Type A (6 inch depth). An original certified check or cashier's check payable to the order of the City of Monterey, or a satisfactory bid bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the bid amount shall be uploaded with each bid, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bid bond must be notarized, include the embossed surety seal, and include a Power of Attorney if the signee is not an officer of the surety. Question Deadline 08/06/2025 at 5:00 PM PT Question Response Deadline:August 8, 2025, 5:00pm Bid Bond Submission Deadline:August 12, 2025, 1:00pm

Award

Roads / Highways

$329,201.00

Public - City

Paving, Site Work

7

5

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 16, 2025

Project location map

N Fremont St, Monterey, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.