BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2025 at 8:00 PM

Updated September 21, 2025

Remodeling of a military facility in Monterey, California. Completed plans call for the remodel of a military facility.

Solicitation Details Agency: U.S. Coast Guard Regional Support Team - Southwest (RST-SW) Set-Aside: 100% Small Business NAICS Code: 238220- Plumbing, Heating, and Air-Conditioning Contractors Size Standard: $19 million Project Scope & Requirements Estimated Magnitude (FAR 36.204): Between $25,000 and $100,000 Start of Performance: Within 15 calendar days of award Completion Deadline: Within 90 calendar days of award Mandatory Performance Period: Yes Payment Protection: Required within 15 calendar days after award Offer Submission Guidelines Offer Validity: Minimum of 30 calendar days Site Visit: Optional; notify the Contracting Officer and Contract Specialist immediately to arrange access SAM.gov Registration: Required at time of offer submission Points of Contact Contracting Officer: shawn.t.jenkins@uscg.mil Contract Specialist: jesus.c.yutig.civ@uscg.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$100,000.00

Public - Federal

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
4
Bidding Soon
675
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2025

October 20, 2025

Project location map

100 Lighthouse Ave, Monterey, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.