BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a bridge / tunnel in Cloverland, Wisconsin. Completed plans call for site work for a bridge / tunnel.

Town of Cloverland, Vilas County Requesting Bids for Culvert Replacement Pickerel Lake Rd The Town of Cloverland is Requesting Proposals From Qualified Contractors for the Replacement of a Culvert on Pickerel Lake Road at Pickerel Creek, to Be Completed During the 2026 Construction Season. Work Includes Removal of Existing Culverts (Including a Previously Buried Culvert), Installation of a Town-supplied 95 Prime Prime *67 Prime Prime * 84' Poly-coated Corrugated Steel Pipe Arch Culvert With Gaskets and Bands, Headwalls and Wingwalls, Backfilling, Slope Grading, Erosion Control, Placement of 4 Inches of Topsoil, Seeding, Asphalt Paving (20 Feet Wide by 2.25 Inches Thick Over a Length of 100 Feet), Full Traffic Control Including a Signed Detour, Utility Coordination, Water Diversion, and All Incidental Work. The Subgrade Shall Consist of 1/4 ^ Prime Prime Cabc Compacted (26 Feet Wide by 8 Inches Thick Over the Length of 100 Feet). All work shall be bid as a lump sum, exceptfor placement of approximately 1,500 tons of fill for 2:1 slopes, which shall be itemized as a unit price per cubic yard. All work must comply with applicable federal, state, and local regulations, including Wisconsin Department of Natural Resources Best Management Practices (BMPs). 1. Traffic Control and Detour - Furnish, install, and maintain traffic control devices in accordance with MUTCD standards. - A full road closure is required. - Establish and sign a detour using Boot Lake Road, Star Lake Road, and Camp 12 Road. - Submit a traffic control and detour plan to the Town for approval before mobilization. Site Preparation & Erosion Control Install erosion and sediment control measures in accordance with WIDNR BMPs. - Protect nearby waterways and environmentally sensitive areas. - The Town will remove all trees within the work zone prior to construction. Culvert Removal and Disposal Excavate and remove the existing culverts. - Remove a previously buried culvert identified at the site. - Properly dispose of all removed materials off-site. Culvert Installation Install the Town-supplied 95" x 67" x 84' poly-coated culvert, including gaskets, bands, headwalls, and wingwalls. - Ensure proper alignment, grade, and structural installation. - Backfill in compacted lifts usingTown-supplied fill. - Construct 2:1 side slopes, blended into the existing terrain. - Placement ofslope fill shall be paid at the unit price per cubic yard. The Cloverland Town Board Has a Right to Refuse Any and All Bids.

Award

Bridges / Tunnels

$170,565.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2025

September 5, 2025

Project location map

Pickerel Lake Rd, Cloverland, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.