Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work for a water / sewer project in Katy, Texas. Completed plans call for site work for a water / sewer project.
Scope includes furnishing all plants, labor, material and equipment and performing all work required for the construction of Sunterra Lakes North Phase I Mass Grading and Detention Facilities. As of 7/25/2025 the plans have been approved by Brookshire Katy Drainage District and currently in for final approval from Waller County. The project is anticipated to receive Notice to Proceed (NTP) in the first week of September 2025. No pipeline removals are required as part of this project. Per the construction plans, all proposed storm sewer crossings over existing pipelines must be installed using trenchless methods. Scope of Work of the Contract includes the Construction of Sunterra Lakes North Phase I Mass Grading and Detention Facilities. For construction contracts $50,000 and over, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner. ON-MANDATORY pre-bid conference will be held on Monday, June 3rd, 2021, at 10:00 a.m. Local time via Question Deadline 08/08/2025 In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer. Bidders should contact the Engineer not less than 72 hours before bid opening to secure any addenda that may affect bidding. Erosion control structures and erosion control protection shall be provided at all lateral drainage arteries entering the bayou, at all backslope drains entering lateral ditches, and such other points as may be designated by the Engineer or shown on the plans. At locations where laterals enter the bayou and no structure is to be constructed, the Contractor shall perform such operations as may be necessary to dress the slopes of the lateral ditch to a uniform section of nice appearance.
Bid Results
Water / Sewer
$14,388,889.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 1, 2025
Multiple Locations, Katy, TX
Related To This Project
Katy, TX
Bid Date: Aug 19 2025
Katy, TX
--
Katy, TX
Bid Date: Aug 14 2025
Katy, TX
--
Katy, TX
Bid Date: Aug 14 2025
Katy, TX
Bid Date: Aug 20 2025
Katy, TX
--
Katy, TX
--
Katy, TX
--
Katy, TX
Bid Date: Aug 01 2025
Katy, TX
--
Katy, TX
Bid Date: Aug 07 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed