Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Site work, paving and outdoor lighting for a mixed-use development in Greenbush, Minnesota. Design plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Project Elements: Pavement Reconstruction Sidewalk reconstruction Storm sewer reconstruction Corridor lighting Utility improvements Tree/brush removal Project Staging Disclaimer: Staging information and detour route are subject to change. Estimated durations and detour are as follows. A detour will be used for the duration of the project. Traffic will detour onto Roseau County roads 4 and 23. Local traffic can use city streets to avoid the road closure. Stage 1 Hwy 11 will be closed between the east side of 4th St to west side of Hwy 32 intersection (Approximately 5 weeks) Work to be completed: Install storm sewer on Hwy 11 Install storm sewer outlet to South Branch Two Rivers Reconstruct Hwy 11 Sidewalk reconstruction Install bases for corridor lighting Stage 2 Hwy 11 will be closed between the west side of 7th St to the east side of 4th St (Approximately 7 weeks) Work to be completed: Install storm sewer on Hwy 11 Reconstruct Hwy 11 Sidewalk reconstruction Install bases for corridor lighting Map showing truck detour route The project will require a detour utilizing Roseau County roads 4 and 23. The project is included in the State's 2025-2029 Capital Improvement Program (CIP). As of July 29, 2025, per owner, MnDOT staff are designing this project. A construction contractor will be selected by low bid after the project is let in February of 2026. Design will be completed in November 2025. Construction is tentatively scheduled for June - Sept 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Roads / Highways
$2,500,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
