BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Renovation of a water / sewer project in Independence, Missouri. Completed plans call for the renovation of a water / sewer project.

The City of Independence, Missouri, invites bids from firms meeting the qualifications to replace the protective coating system of contact basin no. 6 and raw splitter no. 3 structures at the Courtney Bend Water Treatment Plant. Question Deadline 08/13/2025 at 5:00 PM CT All questions must be submitted online. Pre bid meeting notes: Please contact Zach Dean, Project Compliance Coordinator at 816-325-7702 or at zdean@indepmo.org to confirm attendance ahead of time. This shall be the only opportunity for bidders to make pre-bid site visits in preparation of their bid for this project. Arrangements for individual bidder site visits will not be available for this project. The City of Independence, Missouri, invites bids from firms meeting the qualifications set forth herein and in any referenced documents to perform the following scope of work at the Courtney Bend Water Treatment Plant for the Water Division of Municipal Services. The contract for this project shall provide for, but not limited to, all equipment, materials, and workmanship required for the proper surface preparation and application of new protective coating systems to the interior and exterior surfaces of the Contact Basin No. 6 and Splitter Basin No. 3 at the Courtney Bend Water Treatment Plant. The entire scope of work to be completed by the successful bidder shall be further defined by the following line items: ) Lump Sum: Provide for all workmanship, equipment, and materials required and as specified for surface preparation and application of new protective coating system to the wetted surfaces of Contact Basin No. 6. 2) Lump Sum: Provide for all workmanship, equipment, and materials required and as specified for surface preparation and application of new protective coating system to the exterior surfaces of Contact Basin No. 6. 3) Lump Sum: Provide for all workmanship, equipment, and materials required and as specified for surface preparation and application of new protective coating system to the wetted surfaces of Splitter Basin No. 3. 4) Lump Sum: Provide for all workmanship, equipment, and materials required and as specified for surface preparation and application of new protective coating system to the exterior surfaces of Splitter Basin No. 3

Award

Water / Sewer

$555,735.00

Public - City

Renovation

8

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
1
Bidding Soon
871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

September 18, 2025

Project location map

14700 Cement City Rd, Independence, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.