Site work for a water / sewer project in East Fayetteville, North Carolina. Completed plans call for site work for a water / sewer project.
Scope:- This project consists of rehabilitating/replacing existing water mains utilizing an epoxy resin lining system and/or open cut replacement. Work shall include installation of a temporary bypass system, pre-inspection of the mains to be lined, replacement of existing water services, replacement of water mains as directed by Fayetteville Public Works Commission, cleaning the existing main, installation of the liner, post-inspection of the lined mains, and all other items necessary to provide a complete job. Questions will be fielded at the pre-bid meeting and all prospective bidders are required to attend the meeting. Individual telephone inquiries are prohibited. PWC assumes no responsibility to fully inform absentees of clarifications not issued by addendum. Each bid shall be accompanied by a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the Contract in accordance with the bid bond and upon failure to forthwith make payment, the surety shall pay the obligee an amount equal to the amount of said bond. Said deposit shall be retained by the Owner. Performance and Payment Bonds are required in the amount of 100% of the Contract amount and shall be furnished by the Contractor. All Contractors are notified that North Carolina Statutory provisions as to licensing of Contractors will be followed as applicable in receiving and evaluating bids and in reading and awarding the Contract (Chapter 87 of the North Carolina General Statutes). Fayetteville Public Works Commission reserves the right to reject any or all bids for any reason determined by PWC to be in its best interest, or to award the bid to the lowest responsible bidder or bidders, taking into consideration quality, performance, and the time specified in the bids for the performance of the contract. (14%) of the total contract dollars to MBE firms and four percent (11%) to WBE firms. Q/A:- All questions about the meaning or intent of the bid or Contract Documents shall be submitted in writing to Shelby Lesane, Procurement Advisor II, by email to procurement@faypwc.com. In order to receive consideration, questions must be received by Friday, September 26, 2025, 4:00 p.m Water mains identified by Fayetteville Public Works Commission as needing rehabilitating will be cleaned and televised by the Contractor to facilitate the proper installation of the rehabilitation system(s). Water mains will be videoed to verify that conditions are acceptable for the application of the rehabilitation system. Before lining, the Contractor shall provide Fayetteville Public Works Commission with a copy of the pre-lining video, in digital format. Upon completion of the work, the Contractor will televise the line and provide a copy of the post-lining video and output report to Fayetteville Public Works Commission for verification that the work has been properly completed and is acceptable to Fayetteville Public Works Commission. All work shall be done in accordance with the terms and conditions outlined herein, Fayetteville Public Works Commission (PWC) "Manual for the Design and Construction of Water and Wastewater System Extensions" (most recent edition), in accordance with the NCDOT Standard Specifications for Roads and Structures (most recent edition), and subject to final approval and acceptance by Fayetteville Public Works Commission. Target Commission Meeting Wednesday, October 22, 2025 Target City Council Meeting Monday, November 10, 2025
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
December 8, 2025
Multiple Locations, East Fayetteville, NC
Related To This Project
East Fayetteville, NC
Bid Date: Jan 04 2022
East Fayetteville, NC
Bid Date: Jul 27 2020
East Fayetteville, NC
Bid Date: Aug 01 2019
East Fayetteville, NC
Bid Date: May 20 2020
East Fayetteville, NC
Bid Date: Sep 16 2021
East Fayetteville, NC
Bid Date: May 07 2021
East Fayetteville, NC
Bid Date: Nov 16 2021
East Fayetteville, NC
Bid Date: Aug 14 2025
East Fayetteville, NC
Bid Date: Jul 17 2025
East Fayetteville, NC
Bid Date: Jul 22 2025
East Fayetteville, NC
Bid Date: Jul 24 2025
East Fayetteville, NC
Bid Date: Jul 17 2025
East Fayetteville, NC
Bid Date: Jul 30 2025
East Fayetteville, NC
Bid Date: Jul 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.