Site work and paving for a civil project in Lebanon, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
** As of 09/08/2025 project has been awarded to Milcon but no awarded amount available.** Grading of Sitework necessary to create pad ready site for Pool Deck, Pool House Building and Pergola and for overall drainage and grading for roadway extension. Pool Deck, Pool, Pool House, Pergola and Fencing will be under a separate contract to be bid at a later date. Roadway Construction includes Sanitary, Water Main, Storm, Curb, Pavement Section and Services as shown on the plans. Est. Value: $ 659,930.00 Est. Value Notes: 653,700 Questions regarding plans and specifications should be addressed in writing to The Kleingers Group Attn: Troy Messer at Phone: (513) 644-1786; Fax: (513) 779-7852; Email: Troy.Messer@Kleingers.com. All bids must include a Bid Guaranty, as described in the Instructions to Bidders The Project and Work for the Project consists of all labor, materials, equipment, and services necessary for construction of the project identified as Union Village Roadway Extension Project ("the Project"), all in accordance with the Drawings and Specifications provided by the Engineer. The Project must be substantially complete by the Date for Substantial Completion set forth in Section P below. This Basis of Bid for the Project includes general contract for Union Village Roadway Extension Project. 2. Only one contract will be issued by the Owner for constructing the Project, the General Contract, which will cover all scopes of work necessary to construct the Project. 3. The Contractor awarded the General Contract (General Contractor) will be responsible for the performance and coordination of any and all subcontractors and suppliers either directly or indirectly contracted with the General Contractor. 4. Owner will provide Bidders access to the Project site to conduct such examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes, clean up, and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies. The total estimated construction cost for the Base Bid Work for the project for which the bids are being solicited at this time is $ 659,930.00 Question Deadline 08/15/2025 at 1:30 PM ET as per ADDA 2. If a Bidder contemplating submitting a bid for the proposed Project is in doubt as to the true meaning of any part of the Contract Documents, it may submit a written request for an interpretation thereof to the Engineer's representative Troy Messer at Troy.Messer@Kleingers.com. Requests received fewer than 5 days prior to bid opening may not be answered. Any interpretation of the proposed documents will be made by Addendum only, and a copy of such Addendum will be mailed or delivered to each Bidder receiving a set of Contract Documents and each plan room where the Contract Documents are maintained Project Location, Union Village Development North of State Route 63 and East of SR 741 adjacent and south side of Allen Street of Section One of Union Village Development in Turtlecreeek Township, Lebanon Ohio 45036
Award
Roads / Highways
$659,943.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 18, 2025
Multiple Locations, Lebanon, OH
Related To This Project
Lebanon, OH
Bid Date: Aug 27 2025
Lebanon, OH
--
Lebanon, OH
--
Lebanon, OH
--
Lebanon, OH
Bid Date: Sep 30 2025
Lebanon, OH
Bid Date: Oct 02 2025
Lebanon, OH
Bid Date: Mar 26 2026
Lebanon, OH
Bid Date: Aug 26 2025
Lebanon, OH
Bid Date: Aug 06 2025
Lebanon, OH
Bid Date: Jul 11 2025
Lebanon, OH
--
Lebanon, OH
Bid Date: Jun 30 2025
Lebanon, OH
Bid Date: Jul 17 2025
Lebanon, OH
Bid Date: Jun 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.