BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Site work for a water / sewer project in Greenville, South Carolina. Completed plans call for site work for a water / sewer project.

Scope of Services : Contractor to excavate and install new 8" ductile iron water main and related appurtenances. Contractor to make new taps and install new service lines to existing meter locations. Contractor to abandon in place existing water mains. . Project has been designed in-house by Greenville Water Engineering. Project will operate under Greenville Water General DES Permit. 2. Greenville Water Standard Technical Specification document will be required for all work within project scope. 3. Please note that documentation of pressure and leakage testing in accordance with GW Specification Section 4-15 will be required. 4. Project to be under construction within 2 weeks of the issuance of contract. 5. Five (5) compaction tests required at locations to be specified by GW Inspector. 98% compaction required under paved surface and 95% compaction required along ditch sections. 6. Contractor required (per Encroachment Permit Specs) to use screenings on roadway if placing excavated spoils on road surface. 7. Performance Bonds and Payment Bonds on GW standard forms required with GW Contract. 8. Unless noted, all work shown on drawings is required whether or not a specific bid item is listed. Payment for work for which a bid item is not listed shall be included as part of other bid items. 9. Retainage of 10 percent will be deducted from each pay request until project completion and final acceptance of all work performed. 10. Within 10 days of written notice of acceptance of this bid, Contractor will execute the contract and deliver the bonds and insurance certificates to GW. 11. Contractor shall submit the two attached affidavits with his bid: o Ethics in Public Contracting Affidavit o Noncollusion Affidavit of Prime Bidder 12. Contractor will be required to sign a GW release and waiver of lien before final payment is made. Pre-Bid Meeting No Q&A Deadline 08/06/2025 5:00 PM (EDT) Online Q&A Yes Project Duration :60 Days from Notice to Proceed Liquidated Damages :$1000/day Bid Bond :5.00% Payment Bond :100.00% Performance Bond :100.00% Any questions concerning technical specifications may be directed to: Name Matt Raven Title Engineer I Phone 864.241.6127 Email mraven@greenvillewater.com CONTRACTUAL CONTACT Any questions regarding contractual terms and conditions or proposal format may be directed to: Name Will Bettis Title Director of: Procurement & Contracts Phone 864.241.6085 Email wbettis@greenvillewater.com

Award

Water / Sewer

$243,615.00

Public - City

Site Work

4

7

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
66
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

October 15, 2025

Project location map

Glenn Rd, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.