BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a civil project in Almond, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Township of Almond 5th Street Project Proposal Project Overview Fifth Street, From Akron Ave. To County Road D, Approximately 5,335.5 Ft. North. Pulverization Pipe Removal & Installation Base Course Hma Pavement Shouldering Project Location On Route: 5th St. At Route: Akron Ave. Toward Route: Cth D Town of Almond-portage County 001-existing Asphalt Pulverization: Approximately 11,800 Sy Remove Sod From Shoulders-25 Ft. Width. Pulverize Existing Asphalt Pavement. Furnish and Install Water for Dust Control and Compaction. Grade Existing Pulverized Asphalt Pavement-25 Ft. Width. - Furnish and Complete Compaction Total Cost for Item 001 002-sawing: Sawcut Existing Asphalt for a Clean Butt Joint. 86 Feet Approximate Lf Sta. 53+35.5 Sta. 0+00 5th Street and County Road D 27 Feet Approximate Lf 5th Street and Akron Ave. 113 Feet Total Approximate Lf Asphalt Sawing Total Cost of Item 002 003-base Course: Approximately 2,546.42 Tons - Furnish and Install 3 Inches (0.25 Ft.) of Wisdot Spec. 1-1/4" Bad Material (Sta. 0+00 to 53+35.5) Furnish and Install Additional 2 Inches (0.17 Ft.) of Wisdot Spec. 1-1/4" Bad Material ( 27 + 12.5 to 31+42.8) Fine Grade Wisdot Spec. 1-1/4" Bad Material Furnish and Install Water for Dust Control and Compaction. Furnish and Complete Compaction on Wisdot Spec. 1-1/4" Bad Material Total Cost of Item 003 004-hma Pavement: Approximately 1,400 Tons Furnish and Install Wisdot Spec. Type4lt 58-285 Asphalt Mix Maintaining 20ft Width. Compact Wisdot Spec. Type 4lt 58-285 Asphalt Mix to an Average Thickness of 2 Inches 005-shouldering/pe Approaches: Approximately 400 Tons Furnish and Install Wisdot Spec. 1/2 Inch Bad Material Creating a 2-foot Shoulder Furnish and Complete Compaction on Wisdot Spec. 3 1/2 Inch Bad Material Furnish and Install Water for Compaction - Furnish and Install Wisdot Spec. 1/2 Inch Bad Material Creating Smooth Transitions for Pe Approaches Total Cost for Item 005 006-traffic Control/signage: -furnish and Maintain Traffic Control/signage for Project Duration. Total Cost for Item 006 007-corrugated Metal Pipe Removal: - Contractor to Coordinate With Owner to Dispose of Existing Cmp's. -sta. 28+37.3 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. -sta. 38+03.4 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. -sta. 43+14.7 Qty. 1 Cmp Diam: 18in Approx. Length: 30 Ft. Total Cost for Item 007 008-corrugated Metal Pipe Installation: Furnish and Install Corrugated Metal Pipes (Cmp) at Station Locations Below. - Maintain Correct Pipe Cover According to Cmp Manufacturer. Backfill Pipe Trench Free of Rocks & Debris Within 1 Ft. Of Cmp. Compaction Shall Be Achieved in Lifts Not Exceeding 0.5 Ft. Utilize Existing Subgrade for Backfill if Suitable. Sta. 14+94.0 Qty. 1 Cmp Diam: 12in Length: 36 Ft. Sta. 28+37.3 Qty. 2 Cmp Diam: 18in Length: 30 Ft. Qty. 1 Cmp Diam: 18in Sta. 38+03.4 Length: 30 Ft. -sta. 43+14.7 Qty. 1 Cmp Diam: 18in Length: 30 Ft. Total Cost for Item 008 009-roadway Drainage Excavation: Remove Organic Material/sod From Ditch (Sta. 14+48 to Sta. 15+74) Right. Grade to Create a Smooth Transition to Inlet. Excavate Inlet Sump at 14+94.0. (Right) Total Cost for Item 009 Total Project Cost Specials: Utilities: Contractor is Responsible for All Utility Locates and Subsequent Re-locates. Culvert(S); Hdpe (High Density Polyethylene) May Be Substituted for Corrugated Metal Pipes (Cmp). Furnish Hdpe Culvert Pipes, With a Corrugated Outer Wall and a Smooth Inner Liner. Ensure That the Culvert Pipe Conforms to Aashto M294 Type S. Liability Insurance: The Contractor Shall Furnish and Deliver to the Owner a Certificate of Insurance for Worker's Compensation and an Umbrella Certificate of Liability and Property Insurance Before Beginning Work and Shall Notify the Owner Immediately of Any Cancellation or Change in Insurance Coverage. Performance Bond: A Performance Bond in the Amount of 100 Percent of the Total Bid Price Will Be Required of the Successful Bidder in Accordance to Wis. Stat. 779.14(1m) (D)3. Questions and Submittal Contact: Town of Almond Chairperson Kip Gutke 715-340-9960

Award

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
85
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

5th St, Almond, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.