Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Demolition, site work, new construction and addition to a transportation facility in Savannah, Georgia. Completed plans call for site work for a transportation facility; for the addition of a transportation facility; for the demolition of a transportation facility; and for the construction of a transportation facility.
Question Deadline 08/19/2025 Should a Bidder find discrepancies or ambiguities in, or omission from Contract Documents, or should he be in doubt as to their meaning, he shall at once and, in any event not later than ten (10) days prior to bid date. Goals for female participation in each trade: 6.9% The following specifications are intended to outline the work, define functional requirements, and establish minimum standards of quality for the Apron Systems Related Work and Exterior Walkways, hereafter referred to as the Equipment. Provide the design, engineering, fabrication, delivery to/from the site, installation with associated power, control panels, removal, salvage, demolition, testing and turning over in an operable, maintainable, and working order the equipment/components described herein, in compliance with these written specifications and accompanying drawings. In all cases where a device or part of the Equipment is herein referred to in the singular number, it is intended that such reference shall apply to as many such devices as are required to satisfactorily complete the inst This project consists of procuring and installing (5) new passenger boarding bridges for the newly constructed concourse expansion at the Savannah Airport. A Bid Bond in the form as bound in the contract documents or certified check in the amount of not less than five percent (5%) of the total amount bid must accompany each bid. Successful bidder will be required to execute and to provide a Payment Bond and Performance Bond each in an amount of one hundred percent (100%) of the total value of the contract awarded to him with a satisfactory surety or sureties for the full and faithful performance of the work. If the total value of the contract is less than $100,000.00, a Payment Bond or Performance Bond may not be required. This Project is a Federal Aid Project under the provisions of the Airport and Airways Safety and Capacity Expansion Act of 1987. Certain mandatory Federal requirements are included in the Contract Documents. The Bidder's attention is also invited to the General Provisions, Section 130 - REQUIRED CONTRACT PROVISIONS FOR AIRPORT IMPROVEMENT PROGRAM AND FOR OBLIGATED SPONSORS pertaining to Federal requirements regarding labor provisions, minimum wage rates, Equal Employment Opportunity (EEO) and Disadvantaged Business Enterprise (DBE) requirements. The Savannah Airport Commission, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that, in any contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded equal opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. No bid may be withdrawn after closing time for the receipt of proposals for a period of ninety (90) days. This is a bid for construction and therefore the City's local vendor preference ordinance will not apply. The Mayor and Aldermen of the City of Savannah and the Savannah Airport Commission reserve the right to waive any informalities, irregularities, and/or technicalities in or reject any and all bids and/or to award or refrain from awarding the Contract for the Work.
Bid Results
Transportation Terminals
$8,496,166.00
Public - City
Addition, Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2025
September 29, 2025
400 Airways Ave, Savannah, GA
Related To This Project
Savannah, GA
Bid Date: Sep 26 2025
Savannah, GA
Bid Date: Aug 29 2025
Savannah, GA
Bid Date: Sep 26 2025
Savannah, GA
Bid Date: Sep 11 2025
Savannah, GA
Bid Date: Aug 20 2025
Savannah, GA
--
Savannah, GA
--
Savannah, GA
Bid Date: Aug 29 2025
Savannah, GA
Bid Date: Sep 02 2025
Savannah, GA
--
Savannah, GA
Bid Date: Aug 26 2025
Savannah, GA
--
Savannah, GA
--
Savannah, GA
Bid Date: Aug 08 2025
Savannah, GA
Bid Date: Aug 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
