BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work for a water / sewer project in Palmer, Massachusetts. Completed plans call for site work for a water / sewer project.

The Project consists of connecting into the existing 12-inch watermain on High Street. Removal and replacement of 80-feet of asbestos cement (AC) watermain with 12-inch cement lined ductile iron (CLDI) along State Street. Then continued down State Street 1460- feet with the 12-inch CLDI while abandoning the AC pipe in place. The 12-inch CLDI will be increased to 16-inch CLDI for approximately 3,425 linear feet to the intersection with Jim Ash Street where it will be constructed to the entrance of the access road for the proposed new water tank. The Project includes all the associated valves, hydrants, connecting the existing customers to the new watermain as well as installing 23 new service lines to the curb stops to the properties with existing homes on them. Final restoration shall include permanent trench pavement and loaming and seeding. The project consists of the removal, replacement, and extension of the existing waterline in State Street, Bondsville, MA from South High Street to Jim Ash Street This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, && 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. The following waivers apply to this Contract: BABAA De Minimis, Small Grants, and Minor Components. Bidders must meet the minimum experience requirements set forth in Article 3 of the Instructions to Bidders (Section C-200) in the contract documents. Online prequalification of contractors with the class of work as Sewer and Water for the project Question Deadline 08/20/2025

Post-Bid

Water / Sewer

$2,631,025.00

Public - City

Site Work

38

18

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
715
Active Projects
275
Bidding Soon
5,315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

October 27, 2025

Project location map

State St, Palmer, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.