Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 2, 2025 at 8:00 PM
Updated September 3, 2025
Site work and paving for a mixed-use development in Northfield, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of September 2, 2025 this project was awarded to ICON, LLC. in the amount of $854,884.50 023STRM-K40 Location: : Lincoln Parkway adjacent to Linden Street and Dresden Avenue; Spring Street adjacent to Highland Avenue; 1st Street adjacent to Plum Street; and Sibley Swale Park adjacent to Fremont Street. Type of Work: Storm Sewer Construction, Grading, Restoration Approximate Major Items: 1,700 Sq Yd Bituminous Patch Special 600 Lin Ft 12" Rc Pipe Sewer Class V 400 Lin Ft 36" Rc Pipe Sewer Class Iii 550 Lin Ft 48" Rc Pipe Sewer Class Iii 100 Lin Ft Construct Drainage Structure 800 Lin Ft Concrete Curb & Gutter Design B618 40 Each Deciduous Tree 2.5" Cal B&b Each Bid must be accompanied by a Bidder's Bond or Certified Check in an amount equal to at least 5% of the total bid made payable to the City of Northfield City Clerk. No bid shall be withdrawn for a period of thirty (30) days subsequent to the opening of bids without the consent of City of Northfield, Minnesota. The successful Bidder will be required to furnish and pay for a satisfactory performance and payment bonds in the full amount of the awarded bid. The City reserves the right to reject any or all bids and to waive any irregularities thereof MNDOT: Storm Sewer Construction, Grading, Restoration Individual elements of work shall include, but are not limited to: 1. Removal of bituminous pavement, concrete curb and gutter, sidewalk and driveways, pipe and other miscellaneous items. 2. Clearing and grubbing. 3. Grading and excavation. 4. Water main construction. 5. Storm sewer construction. 6. Concrete walk construction. 7. Concrete curbing and driveway pavement construction. 8. Bituminous street and trail construction. 9. Turf restoration and erosion control construction. 10. Traffic Control. 11. Other miscellaneous work shown on the plans or specified herein. Final completion must be achieved by September 11, 2026. Question Deadline 08/14/2025 Any bidder who in doubt as to the true meaning of any part of the plans, specifications or other Bidding Documents, may submit to the Engineer a written request for an explanation or interpretation thereof at least seven (7) days prior to the scheduled Bid opening. Bid(5.0%), Performance(100.0%), Payment(100.0%), Maintenance, Certified Check
Award
Roads / Highways
$854,885.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
October 20, 2025
Multiple Locations, Northfield, MN
Related To This Project
Northfield, MN
Bid Date: Sep 10 2025
Northfield, MN
Bid Date: Oct 16 2025
Northfield, MN
Bid Date: Feb 17 2026
Northfield, MN
Bid Date: Mar 26 2026
Northfield, MN
Bid Date: Feb 05 2026
Northfield, MN
Bid Date: Aug 21 2025
Northfield, MN
Bid Date: Jul 17 2025
Northfield, MN
Bid Date: Jun 04 2025
Northfield, MN
Bid Date: Jun 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
