Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 19, 2025 at 8:00 PM
Updated August 20, 2025
Renovation of a library in San Bernardino, California. Completed plans call for the renovation of a library.
Project Type RFQ (Request for Quote) Response Types Line Items Cost File Response File. Online Q&A Yes Q&A Deadline 08/07/2025 3:00 PM (PDT). 1. Backbone Fiber Installation o Install new singlemode fiber optic cabling from the Main Distribution Frame (MDF) to six (6) Intermediate Distribution Frame (IDF) locations. o Terminate fiber at both ends using appropriate patch panels. o Provide and install conduit, innerduct, or cable tray as needed for proper support, routing, and protection. o Perform testing and certification of each fiber run; submit documentation. 2. Structured Data Cabling (Admin IDF) o Install new Category 6 or higher cabling from the Admin IDF to designated endpoint locations, including staff workstations and wireless access points. o Work shall include: o Termination at patch panels and faceplates o Proper labeling of each run o Testing and certification of all installed cabling The Project/Equipment sought under this request are set forth in more detail in Attachment "A", attached hereto and incorporated herein by this reference. Notwithstanding the inclusion of such Project/Equipment in Attachment "A", the final scope of Project/Equipment negotiated between City and the successful Vendor shall be set forth in the Professional Service Agreement ("Agreement") executed by and between City and the successful Vendor. A copy of the Agreement is attached hereto as Attachment "B" and incorporated herein by this reference. The Vendor shall furnish all labor, materials, equipment, tools, installation, schematic renderings (e.g., network layout or as-built diagrams), coordination, permits, supervision, freight, and incidentals (including tax) as necessary to perform and complete the project as outlined in this RFQ and the resulting Agreement. The City anticipates the following minimum requirements: 1. Backbone Fiber Installation o Install new singlemode fiber optic cabling from the Main Distribution Frame (MDF) to six (6) Intermediate Distribution Frame (IDF) locations. o Terminate fiber at both ends using appropriate patch panels. o Provide and install conduit, innerduct, or cable tray as needed for proper support, routing, and protection. o Perform testing and certification of each fiber run; submit documentation. 2. Structured Data Cabling (Admin IDF) o Install new Category 6 or higher cabling from the Admin IDF to designated endpoint locations, including staff workstations and wireless access points. o Work shall include: o Termination at patch panels and faceplates o Proper labeling of each run o Testing and certification of all installed cabling 3. General Requirements o All work must comply with: o ANSI/TIA/EIA cabling standards o National Electrical Code (NEC) o Applicable California building and fire codes o Use plenum-rated cable where required by code o Coordinate closely with City and Library staff to minimize disruption to operations o Provide as-built documentation, certified test results, and network layout renderings upon project completion Vendor Award (Agreement through DocuSign) September 2025
Post-Bid
Library
$800,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 8, 2025
555 W 6th St, San Bernardino, CA
Related To This Project
San Bernardino, CA
Bid Date: Aug 08 2025
San Bernardino, CA
Bid Date: Oct 24 2025
San Bernardino, CA
Bid Date: Oct 24 2025
San Bernardino, CA
Bid Date: Aug 06 2025
San Bernardino, CA
Bid Date: Aug 05 2025
San Bernardino, CA
Bid Date: Aug 20 2025
San Bernardino, CA
--
San Bernardino, CA
--
San Bernardino, CA
--
San Bernardino, CA
Bid Date: Aug 21 2025
San Bernardino, CA
Bid Date: Aug 28 2025
San Bernardino, CA
Bid Date: Aug 20 2025
San Bernardino, CA
--
San Bernardino, CA
Bid Date: Aug 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
