BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work for a water / sewer project in San Bernardino, California. Completed plans call for site work for a water / sewer project.

Site preparation including developing access routes, haul routes, and staging areas, performing vegetation trimming, clearing, and grubbing in defined areas, removal of trees, general removal of pedestrian trash/debris, traffic control (pedestrian, equestrian and vehicle), and delineating work limits and protecting environmentally sensitive areas. Erosion control including mulch, seed, COIR mat and logs, dewatering and aquatic relocation plan (prior to grading), stormwater and general surface water flow management, and site BMPs (e.g. silt fencing). Grading including excavation, soil placement, and compaction. Earthwork spoils hauling and disposal. Import of materials such as boulders and ESM material required by contractor. Export of excess fill. Construction details including channel section improvements such as invert groins, boulder stacks and fields, and streamflow culvert crossings Implementation of, and adherence to, project specific permits and mitigation and monitoring plan requirements. Each proposal must be accompanied by either a certified or cashiers check or by a corporate surety bond payable to the District on the forms provided, as a guarantee that the bidder will, if an award is made to him/her in accordance with the terms of his/her proposal, promptly execute a contract in the required form, and furnish the necessary insurance certificates, Performance Bond and Payment Bond, in accordance with the Contract Documents. Said check or bidders bond shall be in an amount not less than 10 percent (10%) of the estimated total contract payments for the maximum amount of work which may be awarded the bidder in accordance with the terms of his/her proposal. All questions regarding the project must be submitted on the Bidders Question Form provided and transmitted by email to BIDQ@SBVMWD.COM no later than 5:00 p.m. on August 15, 2025. For purposes of obtaining a Bid Bond, the Engineers Estimate is between $9,000,000 - $11,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$11,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
540
Active Projects
90
Bidding Soon
3,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

October 28, 2025

Project location map

Multiple Locations, San Bernardino, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.