Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated October 15, 2025
Site work for a water / sewer project in Canton, Texas. Completed plans call for site work for a water / sewer project.
Scope 6 and 8 water main improvements along SH 64 and FM 1653 Question Deadline 08/12/2025 No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening DESCRIPTION: The work to be performed under this section shall consist of furnishing all labor, equipment, and materials, and in performing all operations necessary in connection with site clearing and restoration as shown in the plans and specifications herein. It shall be the responsibility of each bidder to examine the site carefully and make his own calculations as to costs to be incurred by reason of the requirements of this section. The construction right-of-way for sewer main construction varies as denoted on the Plans. Site clearing and restoration shall include all of the following: A. The cutting and removal of all trees, shrubs, underbrush, and the removal of any debris existing above natural ground surface and within the limits of right-of-way necessary to permit the construction of the improvements. Trees, shrubs, underbrush, and debris removed from the site shall be disposed of by the Contractor. B. The removal, storage and reconstruction of fences where necessary to permit the construction of the improvements. As quickly as feasible after the work has been performed, fences shall be reconstructed to conditions at least as good as the original. The Contractor shall furnish new materials as necessary to permit proper restoration. C. The repair of yards and lawns that are within the construction right-of-way. Disturbed lawns in the right-of-way shall be graded smoothly with topsoil to their original grade, and grass will be replaced. Likewise, shrubbery, trees, and other plants which must be removed by construction activities within the right-of-way will be replaced. The Contractor should, however, make every reasonable effort to avoid the unnecessary removal of trees, shrubbery and other plants in inhabited areas
Bid Results
Water / Sewer
$369,955.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 18, 2025
Multiple Locations, Canton, TX
Related To This Project
Canton, TX
Bid Date: Nov 06 2025
Canton, TX
Bid Date: Feb 04 2026
Canton, TX
Bid Date: Aug 05 2025
Canton, TX
Bid Date: Aug 19 2025
Canton, TX
Bid Date: Mar 09 2021
Canton, TX
Bid Date: May 29 2025
Canton, TX
--
Canton, TX
Bid Date: Mar 11 2021
Canton, TX
Bid Date: Nov 24 2020
Canton, TX
--
Canton, TX
Bid Date: Mar 21 2025
Canton, TX
Bid Date: Mar 11 2025
Canton, TX
--
Canton, TX
Bid Date: Dec 23 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
