BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated October 15, 2025

Site work for a water / sewer project in Canton, Texas. Completed plans call for site work for a water / sewer project.

Scope 6 and 8 water main improvements along SH 64 and FM 1653 Question Deadline 08/12/2025 No oral interpretations will be made to any bidder. Each request for clarification shall be made in writing to the Grant Recipient or engineer no less than seven (7) days prior to the bid opening DESCRIPTION: The work to be performed under this section shall consist of furnishing all labor, equipment, and materials, and in performing all operations necessary in connection with site clearing and restoration as shown in the plans and specifications herein. It shall be the responsibility of each bidder to examine the site carefully and make his own calculations as to costs to be incurred by reason of the requirements of this section. The construction right-of-way for sewer main construction varies as denoted on the Plans. Site clearing and restoration shall include all of the following: A. The cutting and removal of all trees, shrubs, underbrush, and the removal of any debris existing above natural ground surface and within the limits of right-of-way necessary to permit the construction of the improvements. Trees, shrubs, underbrush, and debris removed from the site shall be disposed of by the Contractor. B. The removal, storage and reconstruction of fences where necessary to permit the construction of the improvements. As quickly as feasible after the work has been performed, fences shall be reconstructed to conditions at least as good as the original. The Contractor shall furnish new materials as necessary to permit proper restoration. C. The repair of yards and lawns that are within the construction right-of-way. Disturbed lawns in the right-of-way shall be graded smoothly with topsoil to their original grade, and grass will be replaced. Likewise, shrubbery, trees, and other plants which must be removed by construction activities within the right-of-way will be replaced. The Contractor should, however, make every reasonable effort to avoid the unnecessary removal of trees, shrubbery and other plants in inhabited areas

Bid Results

Water / Sewer

$369,955.00

Public - City

Site Work

10

10

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
41
Bidding Soon
3,459
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 18, 2025

Project location map

Multiple Locations, Canton, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.