Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Site work for a water / sewer project in Santa Clarita, California. Completed plans call for site work for a water / sewer project.
The work consists of rehabilitating approximately 11,901 feet of existing corroded 12-inch through 30-inch diameter non-reinforced concrete pipe (NRCP), reinforced concrete pipe (RCP), and vitrified clay pipe (VCP) on the Bouquet Canyon Trunk, San Fernando Road Trunk, District #32 Main Trunk, and Valencia Trunk Sewers with cured-in-place pipe liner and 39 manholes with a protective coating system and all appurtenant work. At the time of bid, the Contractor shall possess a valid California Contractors License in one of the following classifications: GENERAL ENGINEERING A, C-34, or C-42 The work of construction must be completed within 220 WORKING DAYS after the date in the Notice to Proceed. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QA date - 26 August 2025 The last day for submitting questions to the District concerning the project, plans, and specifications will be close of business 5 working days prior to the bid opening date.
Award
Water / Sewer
$3,581,999.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 2, 2025
December 15, 2025
To Be Determined, Santa Clarita, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
