BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Warwick, Rhode Island. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project No. 2002-CH-031, IM-2955(085), IMG-2955(087), BHO-2955(086), 2025-CB-048, BHO-PRES(002) Rhode Island Contract No. 2025-CB-048, Federal Aid Project Nos. BRO3296(001) and BRO-3296(002), PTS ID No. 2607F includes the rehabilitation of Bridges 072101 and 072121 and the replacement of Bridges 072251, 072271, 072551 and 072571. Accelerated Bridge Construction techniques will be utilized for the replacement bridges, including bridge slides for the Bald Hill Road Bridge Nos. 072251 and 072271 and Prefabricated Bridge Units (PBUs) for the West Natick Road Bridge Nos. 072551 and 72571. This work will be accomplished during two separate Super Weekends. Vendor Q&A Start Date: July 31, 2025 at 11:15:00 AM EDT Vendor Q&A End Date: August 20, 2025 at 12:00:00 PM EDT Question Deadline 08/20/2025 at 12:00 PM ET If you have any questions, please contact: M. Scott Stephens 1 Capitol Hill 2nd Floor Providence RI, 02908 United States Tel: 401-574-8152 Fax: michael.stephens@purchasing.ri.gov The Contractor will be required to meet the established goal of not less than DBE 8% percent of the contract bid price to the Contractors, Subcontractors, and/or suppliers which qualify as Disadvantaged Business Enterprises A bid bond payable to the State of Rhode Island, in the amount of 5% of the total or gross sum of the bid must be furnished by each bidder. A performance bond of one hundred (100) percent of the contract price with a satisfactory surety company will be required of the successful bidder. All surety companies must be listed with The Department of the Treasury, Fiscal Services, Circular 570, (Latest Revision published by the Federal Register), The Department of Transportation reserves the right to reject any or all bids. RIDOT: Bridge Group 08 - I-295 War, WST

Bid Results

Bridges / Tunnels

$56,981,623.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

567

38

9

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
148
Bidding Soon
4,115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2025

November 4, 2025

Project location map

Multiple Locations, Warwick, RI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.