Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Warwick, Rhode Island. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Project No. 2002-CH-031, IM-2955(085), IMG-2955(087), BHO-2955(086), 2025-CB-048, BHO-PRES(002) Rhode Island Contract No. 2025-CB-048, Federal Aid Project Nos. BRO3296(001) and BRO-3296(002), PTS ID No. 2607F includes the rehabilitation of Bridges 072101 and 072121 and the replacement of Bridges 072251, 072271, 072551 and 072571. Accelerated Bridge Construction techniques will be utilized for the replacement bridges, including bridge slides for the Bald Hill Road Bridge Nos. 072251 and 072271 and Prefabricated Bridge Units (PBUs) for the West Natick Road Bridge Nos. 072551 and 72571. This work will be accomplished during two separate Super Weekends. Vendor Q&A Start Date: July 31, 2025 at 11:15:00 AM EDT Vendor Q&A End Date: August 20, 2025 at 12:00:00 PM EDT Question Deadline 08/20/2025 at 12:00 PM ET If you have any questions, please contact: M. Scott Stephens 1 Capitol Hill 2nd Floor Providence RI, 02908 United States Tel: 401-574-8152 Fax: michael.stephens@purchasing.ri.gov The Contractor will be required to meet the established goal of not less than DBE 8% percent of the contract bid price to the Contractors, Subcontractors, and/or suppliers which qualify as Disadvantaged Business Enterprises A bid bond payable to the State of Rhode Island, in the amount of 5% of the total or gross sum of the bid must be furnished by each bidder. A performance bond of one hundred (100) percent of the contract price with a satisfactory surety company will be required of the successful bidder. All surety companies must be listed with The Department of the Treasury, Fiscal Services, Circular 570, (Latest Revision published by the Federal Register), The Department of Transportation reserves the right to reject any or all bids. RIDOT: Bridge Group 08 - I-295 War, WST
Bid Results
Bridges / Tunnels
$56,981,623.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 5, 2025
November 4, 2025
Multiple Locations, Warwick, RI
Related To This Project
Warwick, RI
Bid Date: Sep 05 2025
Warwick, RI
Bid Date: Aug 26 2025
Warwick, RI
Bid Date: Aug 28 2025
Warwick, RI
Bid Date: Sep 03 2025
Warwick, RI
Bid Date: Sep 04 2025
Warwick, RI
Bid Date: Sep 04 2025
Warwick, RI
--
Warwick, RI
Bid Date: Aug 19 2025
Warwick, RI
Bid Date: Aug 14 2025
Warwick, RI
--
Warwick, RI
--
Warwick, RI
Bid Date: Jul 23 2025
Warwick, RI
Bid Date: Jul 23 2025
Warwick, RI
Bid Date: Jul 22 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
