BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work for a water / sewer project in Shoreview, Minnesota. Completed plans call for site work for a water / sewer project.

Pre-Qualification:Yes Question Deadline 08/18/2025 All questions regarding this IFP are to be directed only to the IFP Administrator Name: Sally Amoe Phone: 651-602-1238 E-mail: sally.amoe@metc.state.mn.us The Metropolitan Council (Council) is soliciting Prequalification Submittal Documents (PSD's) for the purpose of establishing a list of prequalified SPECIALTY CONTRACTORs to provide the construction work required to complete the dewatering and tunneling portions of the Council's Grass Lake Interceptor Relocation project. The purpose of this Invitation for Prequalification (IFP) is to develop a list of SPECIALTY CONTRACTORs with previous experience in the successful performance of similar work from which to request bids. PSD's may be submitted for either or both the of the following specialities: Dewatering, Pilot Tube Microtunneling. The prequalification for dewatering and for tunneling will be used to create a list of prequalified SPECIALTY CONTRACTORs that will be allowed to perform the work of the dewatering and tunneling portions of the Grass Lake Interceptor Relocation project. The project will include both tunneling and open trench installation and manhole installation for regional interceptor sewer. The project is located in Shoreview, Minnesota, on the east side of Grass Lake. Dewatering The proposed sewer work includes installing approximately 4,700 lineal feet of cut and cover sanitary sewer interceptor and 350 lineal feet pipe-jacked tunnel. Pipe invert depth ranges from 13 feet to 45 lineal feet below the ground surface. The interceptor will be constructed under parklands and wetlands. The interceptor will be constructed in coarse and fine alluvial soils primarily consisting of poorly graded sand, sand with silt, and silty sand. The groundwater level is expected to be 10-ft to 20-ft above the interceptor invert. Dewatering consisting of deep wells or well points will be required to construct the interceptor. Tunneling The tunneling work includes installing approximately 350 lineal feet of 42-inch to 48-inch diameter casing. Casing invert depth ranges from 13 feet to 24 lineal feet below the ground surface. The tunnel will be constructed under wetlands. A 36-inch RPMP carrier pipe will be installed inside the casings. The tunnel will be constructed in coarse and fine alluvial soils consisting of poorly graded sand, sand with silt, and silt . Blow counts ranging from 1 to 21 blows per foot. The groundwater level is expected to be 10-ft to 12-ft above the casing invert. Tunneling method currently being considered, and for which qualifications are requested by this solicitation is pilot tube microtunneling with powered cutter head. The tunneling method is defined in Attachment 4..

Post-Bid

Water / Sewer

$600,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
232
Active Projects
70
Bidding Soon
1,511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

Multiple Locations, Shoreview, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.