BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 23, 2025

Renovation of a mixed-use development in Schoolcraft, Michigan. Completed plans call for the renovation of a educational facility.

Schoolcraft Community Schools is presenting an opportunity to completely demo and remove boilers 1 & 2 at our 7-12 Jr/Sr High School. 13400 south 14th street Schoolcraft MI. 49087 Scope SCS is seeking bids for the complete demo and removal of boilers 1 & 2 and complete installation of 2 new boilers. The complete installation will require the following: Electrical work to bring power back to the new boilers Controls work to be completed to tie back into our BMS system Exhaust duct work will need to be adapted to fit new boilers and our current exhaust stack Natural gas lines will need to be reworked and plumbed into the new boilers The new boilers will require a factory authorized rep to complete and document startup of the new boilers. Special note: the contractor is responsible for verifying that any programs in the BMS system will not violate manufacturers specifications for boiler operations. The awarded contractor will guarantee this project will be completed and the new boilers will be fully operational prior to Oct 1 st of 2025. The district will attempt to provide a written response to all written requests for clarification within 72 hours after the receipt of such request. The district will not respond to any requests for clarification less than 72 hours prior to the deadline to submit the proposal. All requests for clarification and inquires must be made to Marc Fox at foxm@schoolcraftcs.org. Furnish Performance and Payment Bonds, in a form satisfactory to the District, in the amount of 100% of its Proposal by a Treasury listed Surety licensed to do business in the State of Michigan The project will be completed in two phases as outlined below: Phase1 Demo boilers 1 & 2 Remove control wires (preserve) remove gas lines, electrical, supply and return heating pipes, remove exhaust piping, Remove boilers from the building. Phase 2 Install new boilers Connect electric Connect control leads (BMS) Pipe in natural gas Pipe in supply and return pipes Adapt exhaust piping to the main stack Question Deadline 08/25/2025 All requests for clarification and inquires must be made to Marc Fox at foxm@schoolcraftcs.org . All such requests must be made in writing via email. The district will attempt to provide a written response to all written requests for clarification within 72 hours after the receipt of such request.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
4
Bidding Soon
1,027
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

13400 S 14th St, Schoolcraft, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.