Published September 5, 2025 at 8:00 PM
Updated September 6, 2025
Renovation of an educational facility in Sacramento, California. Completed plans call for the renovation of a educational facility.
The work shall consist of, but not limited to the installation of new Spilt Air Conditioning system, as shown on drawings. The work will take place within the specified area designated within this contract's documents. Online Q&A Yes Q&A Deadline 08/11/2025 12:00 PM (PDT) Liquidated Damages 1-30 $250.00 ; 30+ $500.00 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date ESTIMATED 9/08/2025 Project Duration 30 DAYS License Requirements B & C20 A. The Contractor shall develop a network plan and schedule for the project demonstrating complete fulfillment of all contract requirements and shall keep the network plan up to date in accordance with the requirements of this section. The Contractor shall employ the Critical Path Method (CPM) in developing the plan and schedule, and in the planning, coordinating, performing and reporting the work under this contract, including all activities of Subcontractors, equipment vendors, suppliers, and any the Owner functions that impact the work. It is explicitly understood that the schedule shall be employed by, and is vital to, the Owner's Representative and the Owner's Project Manager in monitoring the progress of the Work and administering this Contract. B. The CPM schedule shall be prepared using Primavera Project Planner version 3.1 or Primavera Sure Trak version 3.0. or some other schedule program. Equivalency of a proposed substitute CPM program shall be determined by the Owner's Project Manager at his/her sole discretion upon the application from the Contractor. Regardless of which scheduling software is used it must have the capability of a definitive "Data Date" that will illustrate impacts to individual activities and the overall project where an activity's progress is not proceeding as originally planned or it has not started as planned. If a substitute CPM program is used in the development of the schedule, it is the responsibility of the Contractor to assure that it is readable in Primavera version 3.1. C. The principles and definition of CPM and the terms used herein shall be as follows: CPM network is a graphic description of the construction plan, showing the sequential steps needed to reach the completion of the Work. It shall depict events and tasks, and their interrelationships, and shall recognize the progress that must be made in one task before subsequent tasks can begin. The CPM network shall be comprehensive and shall include all interdependencies and interactions required to perform the Work of the Project. The only activity in the schedule that will not have a predecessor is the Project Start or Notice to Proceed Milestone. The only activity in the schedule that will not have a successor is the Project Completion Milestone. All other activities in the schedule shall have predecessor and successor logic ties.
Bid Results
Educational
$127,500.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
September 8, 2025
4700 College Oak Dr, Sacramento, CA
Related To This Project
Sacramento, CA
--
Sacramento, CA
--
Sacramento, CA
Bid Date: Sep 04 2025
Sacramento, CA
Bid Date: Sep 17 2025
Sacramento, CA
Bid Date: Aug 27 2025
Sacramento, CA
Bid Date: Aug 15 2025
Sacramento, CA
Bid Date: Aug 15 2025
Sacramento, CA
Bid Date: Aug 27 2025
Grind Existing Concrete Pavement, HMA and Modify Ramp Metering Systems - Sacramento County - 5861273
Sacramento, CA
Bid Date: Aug 12 2025
Sacramento, CA
Bid Date: Aug 07 2025
Sacramento, CA
Bid Date: Aug 21 2025
Sacramento, CA
Bid Date: Aug 26 2025
Sacramento, CA
Bid Date: Sep 26 2025
Sacramento, CA
Bid Date: Aug 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.