BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

This is a service / maintenance or supply contract in Schaumburg, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on October 27, 2025, at 10:00 AM at the Region One/District One Office in Schaumburg. Phase II engineering services are required to provide for work related to contract plan preparation for road and bridge improvements, development of specifications and estimates, plan review, and surveying on various projects in District One. Work Orders may include the preparation of contract plans for various projects involving roadway, bridge repairs and improvements, drainage improvement plans, preparation of miscellaneous roadway plans and structure details, lighting plans, traffic signal plans, ADA ramp details, review of plans by Consultant and local agency consultants for roadway and rehabilitations projects, obtaining pavement composition cores for resurfacing projects and geotechnical borings for structure design, geotechnical reports, and providing supplemental roadway and bridge deck surveying for various projects. The primary focus of the scope of work order will be contract plan preparation for roadway related projects. A significant volume of tasks will involve extensive Accessible Pedestrian Signals (APS). The selected Consultant is expected to meet the department's need by ensuring that a considerable portion of work is dedicated to the completion of signal-related tasks. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The estimated construction cost for this project is $300,000 to $6,000,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 19 - RFQ - Various Phase II Projects and Value Engineering, Various Routes

Conceptual

Bridges / Tunnels

$6,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
514
Active Projects
277
Bidding Soon
3,745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2026

Project location map

Multiple Locations, Schaumburg, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.