BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work and paving for a water / sewer project in Cut Off, Louisiana. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

** As of September 10, 2025. Project has not been awarded yet. A timeline of award has not been established yet ** The intent of the contract is to provide for performance and completion of the described project. The contractor is obligated to complete the project in accordance with the contract documents. The Scope of Work consists of, but is not limited to, the following: i) all Work necessary to perform, construct, and complete the items described by the Contract, which may include extra work; ii) all Work made necessary by an increase in the quantity of a major or minor pay item; iii) all other Work incidental and necessary to perform, construct, and complete the Work specifically referenced or described by the Contract and necessary for delivery of a completed Project conforming to the Contract and suitable for its intended purpose; iv) the performance of any testing as directed by the Engineer to determine if any work or any finished product complies with the Contract, and; v) except as provided in 105.03, to correct and/or replace deficient or nonconforming work, materials, or finished product at no additional cost or expense to the Contracting Agency with work, materials, or finished product that does conform to the Contract. Every request for such interpretation should be emailed to Ben Hodson, General Manager, at ben@picciola.com. To be given consideration, such requests must be received no later than seven (7) calendar days prior to the date fixed for the opening of Bids to permit written distribution of response to all Bidders. The entire contract shall be completed in all details and ready for final acceptance in accordance with General Provisions Subsection 105.17.2 within one hundred twenty (120) calendar days.

Award

Water / Sewer

$677,000.00

Public - State/Provincial

Paving, Site Work

19

7

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
72
Bidding Soon
770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

October 3, 2025

Project location map

To Be Determined, Cut Off, LA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.