Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated September 16, 2025
Site work and new construction of a playground / park / athletic field in Cut Off, Louisiana. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.
As of September 15, 2025, this project has not yet been awarded. A timeline for award has not yet been established. No project Contract Documents will be provided by the Architect or Owner. Each bid shall be accompanied by a bid security of not less than five (5%) percent of the total bid amount. Said amount shall be in the form of a Bid Bond, Certified Check, or Cashier's Check drawn on a bank insured by the Federal Deposit Insurance Corporation payable to the Special Education District No. 1. The successful lowest responsible and responsive bidder shall be required to furnish the Owner with a performance bond for 100% of the contract amount prior to the issuance of a contract to perform the work. No bid may be withdrawn for a period of 45 days after receipt of bids. The time of completion of this project is prime importance. The Bidder agrees to commence work under this contract not later than the date indicated in the Owner's written Notice to Proceed. All of the work required shall be completed within 150 calendar days from the Notice to Proceed. Should the Contractor neglect, refuse or fail to complete the work or obtain approval from the State Fire Marshal's Office for occupancy on the amount of calendar days indicated above, the Owner shall have the right to deduct from and retain out of such moneys which may be due or which may become due and payable to the Contractor, as indicated in Article 9 of the Instructions to Bidders for each and every day that such completion of the work is delayed beyond the prescribed date / calendar days, as liquidated damages and not as a penalty. If the amount due and to become due from the owner to the Contractor is insufficient to pay in full any such liquidated damages, the contractor shall pay the owner the amount necessary to affect such payment in full. Provided, however, that the Owner shall promptly notify the Contractor in writing of the manner in which the amount retained, deducted, or claimed as liquidated damages was computed. Designer will be paid for prolonged contract administration and observation of construction should the contract time, as may be extended, be exceeded due to no fault of the Designer and liquidated damages are recommended by the Designer. The amount of such payment shall be computed by dividing 20% of the basic total fee by the number of days construction time, as extended to the contractural completion date, and multiplying by the number of days of liquidated damages recommended by the Designer. The Designer's prolonged contract administration shall be compensated by deducting from moneys which may become due and payable to the Contractor.
Post-Bid
Playgrounds / Parks / Athletic Fields
$174,000.00
Public - County
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 6, 2025
To Be Determined, Cut Off, LA
Related To This Project
Cut Off, LA
Bid Date: Oct 28 2025
Cut Off, LA
Bid Date: Jan 06 2026
Cut Off, LA
Bid Date: Jan 14 2026
Cut Off, LA
Bid Date: Feb 27 2026
Cut Off, LA
Bid Date: Feb 27 2026
Cut Off, LA
Bid Date: Sep 03 2025
Cut Off, LA
Bid Date: Oct 29 2025
Cut Off, LA
Bid Date: Jul 01 2025
Cut Off, LA
Bid Date: Jul 01 2025
Cut Off, LA
Bid Date: Jun 05 2025
Cut Off, LA
Bid Date: Feb 27 2025
Cut Off, LA
Bid Date: Jan 03 2025
Cut Off, LA
Bid Date: Jul 09 2025
Cut Off, LA
--
Cut Off, LA
Bid Date: Jun 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
