BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a playground / park / athletic field in Topeka, Kansas. Completed plans call for site work for a playground / park / athletic field.

Shawnee County is soliciting sealed proposals from qualified contractors to provide concrete footings for the Sky Trail construction in Play Land located in Gage Park and operated by the Shawnee County Parks and Recreation Department. Shawnee County Parks and Recreation Department (SCP+R) is seeking proposals from qualified contractors to provide all labor, materials, construction equipment, coordination, and supervision necessary for the construction of concrete footings necessary for the installation of the Sky Trail at the Gage Park Play Land.. The work shall include the construction of necessary concrete footings for a custom multi-tower aerial adventure trail playground structure (Sky Trail) as an unattended net play structure Work shall include concrete structural footings detailed in the project concept drawings, design drawings, and specifications contained herein. A. Background: The proposed project is the phased construction of a blend of features including. 1. Phase 1 (This RFP): The construction of concrete footings and concrete retaining wall for the Sky Trail aerial adventure system. 2. Phase 2 (future RFP): Construction of a Play Area (PA-1) with play features that interact directly with the Sky Trail tower system. 3. Phase 3 (future RFP): Construction of a large, combined Play Area (PA-2, 3, 6, 7, and 8) with multiple play features contained in one large fall protected area. 4. Phase 4 (future RFP): Construction of a large, combined Play Area (PA-1, and 4) with multiple play features contained in one large fall protected area. 5. Phase 5 (future RFP): Construction of Stand Alone Play Areas (PA- 5, 9, and 10). 6. Phase 6 (future RFP): Construction of miscellaneous features addressing subsurface drainage, fencing, sidewalks, bench installation, curbing, concrete pads, and ancillary equipment. B. Sky Trail Concrete Footings: The scope of work includes the following tasks. Reference RCI Drawing Sheets for more detail: 1. Procurement of steel reinforcement (See 1.3h above). 2. Field location and construction of concrete footings for all aerial towers and accessory features (climbers, slides, and retaining wall) for the entire Sky Trail currently under fabrication by RCI Adventures, per the detailed footing specifications outlined in Section 2.2 and the drawings. This work will include compacted backfill around each footing to match existing/proposed grade. 3. Construction of 12" x 12" interior concrete curbing (between Sky Trail footings) for PA-1 prior to placement of Sky Trail Towers 1, 1A, 1B, 1C, 1D, and 2 and their companion trail segments. The segments of 12" x 12" concrete curbing will be placed on the interior of PA-1 between Sky Trail tower footings for PIP boundary and future fence (by SCP+R). 4. The contractor shall prioritize the construction of footings for Area PA-1, including Towers 2 and 3, Towers 4 through 7, and Towers 8 through 9 to facilitate project completion in a timely manner. 5. The retaining wall footing (FT106) must be constructed as part of the construction for towers 4-7. 6. Basis of Payment: Unit price ($/Each) for each type of footing. Costs will include all materials, labor, excavation, base preparation, form setting, steel placement, concrete placement, finishing, and compacted backfill. All questions regarding this RFP should be submitted through the Shawnee County Online Bid Portal. The last day to submit questions: August 21, 2025, at 12:00 PM (local time).

Award

Playgrounds / Parks / Athletic Fields

$240,723.00

Public - County

Site Work

23

4

14

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

635 SW Gage Blvd, Topeka, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.