Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a sidewalk / parking lot in Topeka, Kansas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project consists of Curb & Gutter replacement on SW 37th St btw. Topeka Blvd & Kirklawn Ave, as shown on the included Exhibit. Since the curb & gutter project is followed by Mill & Overlay project, the schedule for this project is very critical. The intent of this project is to remove & replace the Combined Curb & Gutter (Type Varies) without damaging the existing adjacent and/or abutting sidewalks or drive approaches. Bid Bond Required No Question Deadline 08/13/2025 at 5:00 PM CT Project consists of Curb & Gutter replacement on SW 37 th St btw. Topeka Blvd & Kirklawn Ave, as shown on the included Exhibit. Since the curb & gutter project is followed by Mill & Overlay project, the schedule for this project is very critical. The intent of this project is to remove & replace the Combined Curb & Gutter (Type Varies) without damaging the existing adjacent and/or abutting sidewalks or drive approaches. Project may include additional work associated with or affected by the construction activities. The approximate quantities of the curb and gutter replacement project are: 1. Combined Curb & Gutter (type varies) 1,071 LF 2. Concrete Valley Gutter 42 SY 3. 4" Concrete Sidewalk 50 SF 4. 6" Concrete for approach transitions 40 SF 5. Aggregate Base - Type AB-3 42 Ton 6. Steel Plate for Driveway Access 1 Each 7. Seeding, Fertilizing and Mulch 0.10 Acre 8. Traffic Control 1 LS The specific area for limits of the work will be marked, by City of Topeka staff prior to construction. The City reserves the right to increase or decrease the project quantities and acknowledges these additions/deletions may increase or decrease project quantities and Contractor compensation based on the unit prices bid. There will be no increase or decrease in unit prices associated with any addition/deletion in quantity The Engineering Division will issue a Start Work Order after contract execution by the city. COMBINED CURB & GUTTER, (modified) and TYPE (varies), shall be field measured to the nearest 0.1 foot and paid at the unit price bid per nearest LINEAR FOOT (LF). The unit price bid shall be full compensation for all labor, equipment, materials, tools and incidentals needed to complete the work as specified for COMBINED CURB & GUTTER, (modified) and TYPE (varies).

Award

Sidewalks / Parking Lot

$61,578.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
86
Bidding Soon
1,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

September 8, 2025

Project location map

SW 37th St, Topeka, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.