Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 7, 2026 at 8:00 PM
Updated May 20, 2026
Demolition, site work and new construction of a mixed-use development in Chesapeake, Virginia. Conceptual plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.
One of the recommendations resulting from the joint consultant study between the School Board and City Council was the need to replace and expand the current Chesapeake Career Center. The current facility, over 50 years old, is in need of replacement to better support current and future programs. A planning group determined the vision and scope for the instructional program for the future facility. To date, $13,000,000 has been allocated to this project for design, with another $3,000,000 allocated to purchase equipment. The Clearfield Avenue site owned by the school district is being repurposed to support the construction of the new Chesapeake Career Center. This property was initially designated for a future elementary school. However, recent enrollment and demographic trends have shown that the existing elementary school capacity in the Greenbrier/Crestwood middle school planning area can accommodate expected student growth. Design work, though funded, will not start until full project funding is confirmed. If funding is obtained, the district expects to select an architectural firm by Summer 2026. The project is included in the City's 2026-2036 Capital Improvement Program (CIP). As of April 7, 2026, a design firm has not been selected, but an RFP is expected to be issued around May of 2026. Construction expected in 2027-2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$101,500,000.00
Public - City
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Clearfield Ave, Chesapeake, VA
Related To This Project
Chesapeake, VA
Bid Date: Jan 15 2026
Chesapeake, VA
Bid Date: Jan 09 2026
Chesapeake, VA
Bid Date: Dec 09 2025
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
--
Chesapeake, VA
Bid Date: Nov 04 2025
Chesapeake, VA
Bid Date: Nov 19 2025
Chesapeake, VA
--
Chesapeake, VA
Bid Date: Oct 29 2025
Chesapeake, VA
Bid Date: Oct 28 2025
Chesapeake, VA
Bid Date: Nov 12 2025
Chesapeake, VA
Bid Date: Oct 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
