BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Renovation of a library in North Miami, Florida. Completed plans call for the renovation of a library.

**As of October 17, 2025, the project was awarded to CMM Roofing, Inc., with an awarded amount of $155,636.80** Note: All Prospective Bidders/respondents Are Hereby Cautioned Not to Contact Any Member of the the City of North Miami Staff or Officials Other Than the Specified Contact Person. Question Deadline 08/15/2025 at 3:30 PM ET The Contractor shall address all inquiries directly and only to the Owners Representative. The City of North Miami reserves the right to reject any or all bids/proposals with or without cause; to waive any or all irregularities with regard to the specifications and to make the award to the firm offering the greatest advantage to the City. All Roof Areas Are to be Included in Bid over famous footwear flat and tile 1. Remove and dispose of all existing roof shingle and underlayment membrane and metal flashing down and all roof vents to the exiting wood substrate . 2. Replace all rotten wood including fascia board include 100 l.f. in base bid and price per L.F.for over 100 l.f. discovered during the removal process. Please include 100 sq. ft. of rotten wood decking in your base bid. Also, include unit pricing for any rotten wood discovered that is above the amount included in the base bid. 3. Re-nail wood deck per Florida building code 2023. 4. Contractor is to replace all L-metal and counter flashing , color to match existing 5. Over the wood substrate mechanically attach a 30-lb. felt over wood deck with a minimum 4" side lap and 6" end lap. Fasten with approved nails and tin caps at 6" on center in the laps and 2 rows staggered in the field of the roll at 12" on center. 6. Over the mechanically fastened 30 lb felt install a new timberline shingles. 7. All new roofing accessories and flashing are to be installed per manufactures specifications. 8. Install new GAF Timberline shingles following the requirements of Miami-Dade NOA # 19- 0312.04. Shingle and edge metal color to be chosen by the owner. 9. Underlayment must not be left open and exposed more than 30 days after installation 10. It is Contractor's responsibility to ensure all local, state and federal codes are met concerning all work on this contract. 11. Contractor to provide electricity as required. 12. Metal flashing cleats or clips will be one gauge thicker than material being cleated if used. 13. Contractor is to maintain the building in water tight condition during construction and at the end of each work day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Library

$155,637.00

Public - City

Renovation

3

12

2

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
111
Bidding Soon
1,690
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2025

September 30, 2025

Project location map

835 NE 132nd St, North Miami, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.