Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Renovation of a clubhouse / community center in Montrose, Pennsylvania. Completed plans call for the renovation of a clubhouse / community center.
**As of September 24 ,2025, As of August 4th, 2023 , this project has not yet been awarded. The project is expected to be awarded on October 2, 2025 ** Bids will be received for the Grange Hall Re-Construction in the following categories: Heating, Ventilation, and Air Conditioning 1. Mobilization 2. HVAC System a. Provide and Install 36,000 BTU Outdoor Unit b. Provide and Install 24,000 BTU, 12,000 BTU, and 7,000 BTU Indoor Systems Mini-Split HVAC Units in each office and meeting area c. Thermostat for each unit Question Deadline 09/02/2025 at 4:00 PM ET Location online portal. Note: all inquiries and questions regarding this project shall be submitted via the "Ask a Question" feature in PennBid Lori Raub, Supervisor Ph: (570) 767-4219 email: lorilibertytwp@gmail.com No verbal instruction or verbal information to bidders will be binding on the Township. The written instructions will be considered clear and complete unless written attention is called to any apparent discrepancies or incompleteness before the opening of the bids. Every request for an interpretation shall be made in writing to the Owner via the "Ask a Question" feature in PennBid. Any inquiry received seven (7) or more days prior to the date fixed for the opening of Bids will be given consideration All bids must be accompanied by either a Certified Check, Cashiers Check, or Bid Bond executed by the bidder and an acceptable surety payable to the Township of Liberty, in the amount of ten percent (10%) of the total bid. This project is subject to the provisions of the Pennsylvania Prevailing Wage Act. The award will be made, usually within thirty (30) days, to the lowest responsible and responsive bidder submitting a bid in conformity with the specifications. However, the Township reserves the right to reject any or all bids. -new covered front entry -entrance ada compliant - add second floor deck -open storageinsulated w/1 1/2" closed cell spray poly & r-30 batt insulation for main floor below - 3/4" advantech decking top of second floor deck& 5/8" sheetrock below - replace & level existing main floor joists & add 3/4" advantech - replace existing main floor flooring w/ new carpet tile - renovate break room area - add ada approved h.c. baths on main floor - add (2) offices on main floor - add new ibc code compliant stairwell in front of conference area max. rise 7" and min. run 11 " - existing bath becomes utility/storage room - add ada compliant handicap van parking the work shall be fully completed by October 1, 2026.
Bid Results
Clubhouse / Community Centers
$22,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2025
October 9, 2025
5010 Creamery Rd, Montrose, PA
Related To This Project
Montrose, PA
Bid Date: Sep 09 2025
Montrose, PA
Bid Date: Sep 09 2025
Montrose, PA
--
Montrose, PA
Bid Date: Sep 09 2025
Montrose, PA
Bid Date: Jul 31 2025
Montrose, PA
Bid Date: Aug 26 2021
Montrose, PA
Bid Date: Jul 07 2025
Montrose, PA
Bid Date: May 30 2025
Montrose, PA
Bid Date: May 30 2025
Montrose, PA
Bid Date: Mar 25 2025
Montrose, PA
Bid Date: Apr 02 2025
Montrose, PA
Bid Date: Feb 28 2025
Montrose, PA
Bid Date: Feb 28 2025
Montrose, PA
Bid Date: Jan 16 2025
Montrose, PA
Bid Date: Oct 07 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
