Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
Site work for a bridge / tunnel in Pikeville, Kentucky. Completed plans call for site work for a bridge / tunnel.
Question Deadline 08/15/2025 questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered. Sealed bid documents for the following work will be received by the Division of Engineering and Contract Administration. Bids will be received through Vendor Self Service VSS as described in the manner and on the date hereinafter specified for the furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for 24045 AMLBAML, AML Project, Pike County, Kentucky, as set forth in the specifications and as shown on the drawings prepared by and approved by the Department for Facilities and Support Services of the Commonwealth of Kentucky and under the terms and conditions to this Request for Bid. This site was previously addressed under the Frank Hatcher HP AML Reclamation project and Frank Hatcher HP Repair AMLRP. Weather related erosion issues have developed after the completion of these projects including erosion of the channel downstream of an existing 18" dia. culvert, sedimentation in the concrete block-tied mat and Class II ditch channels, erosion of the Class II and grass swale ditches upstream of the culvert and sediment deposition on the first bench above the residence. This project will remove the sediment obstructing flow in the established ditches on the first bench above the residence to existing outlets. Adjacent and downslope of the strip to rock area, the eroded grass swale ditch and impacted Class II ditch will be replaced with a 2 foot flat bottom Class II ditch. The 18" culvert will be replaced with a 24" HDPE culvert, adjusting its direction of flow onto a newly installed concrete block-tied match ditch and ultimately into the existing headwall just downstream. An 8-inch diameter pipe draining the access road ditch beyond the replaced culvert will also be replaced and the flow path adjusted to outlet onto the newly installed concrete block-tied mat ditch. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business by the Kentucky Secretary of State and the Kentucky Department of Insurance within the Commonwealth of Kentucky. The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served. All Procurement Questions Shall Be Directed to Buyer of Record for This Project. Estimated Length of Project: (Substantial Completion) + 60 Calendar Days (Final Completion)
Award
Bridges / Tunnels
$28,597.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
September 26, 2025
509 Tollie Ln, Pikeville, KY
Related To This Project
Pikeville, KY
Bid Date: Sep 25 2025
Pikeville, KY
Bid Date: Sep 25 2025
Pikeville, KY
Bid Date: Jul 15 2020
Pikeville, KY
Bid Date: Jul 18 2019
Pikeville, KY
Bid Date: Sep 15 2025
Pikeville, KY
Bid Date: Oct 22 2025
Pikeville, KY
Bid Date: Nov 13 2025
Pikeville, KY
Bid Date: Nov 03 2025
Pikeville, KY
Bid Date: Sep 25 2025
Pikeville, KY
Bid Date: Aug 18 2025
Pikeville, KY
Bid Date: Aug 18 2025
Pikeville, KY
Bid Date: Aug 18 2025
Pikeville, KY
Bid Date: Aug 18 2025
Pikeville, KY
Bid Date: Aug 06 2025
Pikeville, KY
Bid Date: Jul 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
