Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 10, 2025 at 8:00 PM
Updated September 11, 2025
Site work for a golf course in Needham, Massachusetts. Working plans call for site work for a golf course.
**As of September 10, 2025, no bids received. No definite date for the rebid.** Newton Commonwealth Golf Course Hole 6 & 10 Renovations Bunker Construction 1. Stripping and disposal of all sod within delineated work areas 2. Removal and disposal of all interior bunker sand 3. Removal and disposal of all interior bunker drainage 4. Location/Flushing and capping of existing exit drainage 5. Stripping and stockpiling of all available topsoil (where work is limited existing topsoil may remain in place and be reworked) 6. Restorative or Reconstructive Shaping bunker per sketches and/or field directives 7. Finishing all areas to be sodded including topsoil placement, raking and preplant fertilization 8. Installation of interior bunker drainage per specifications and field layout including tie into existing exit lines 9. Installation of interior bottom sod liner (if specified) 10. Round Up or approved equivalent of all sod bottoms prior to sand installation 10. Installation of Specified Sod on all disturbed areas 11. Installation of bunker sand 12. Finish rake and plate compact bunker sand to specified 5" Greens Construction 1. Stripping (Harvesting-option) all existing green sod Hole 6 (staging in area for continued watering as directed by CLUB 2. Stripping and disposal of all sod within delineated work areas 3. Removal and Stockpiling all interior greens mix material for future use in green surrounds areas 4. Removal and disposal of all interior greens drainage 5. Stripping and stockpiling of all available topsoil (where work is limited existing topsoil may remain in place and be reworked) 6. Construction/Shaping of new green complex including all core elevations, surrounds, approaches per sketches and/or field Directives 7. Installation of all interior greens and exterior surrounds drainage 8. Installation of all interior specified greens rootzone (finish float) 9. Finishing all areas to be sodded withing green surrounds and approach/rough areas 10. Sodding green surface with specified blend 11. Installation of Specified Sod on all disturbed areas Wall Construction 1. Dismantle/Removal of existing keystone block wall (hole 10); stone wall (hole 6/7 tee) 2. Remove all wall material off site 3. Construct new keystone walls at holes 10 and 7 tee per project specifications (including stone backfill with drainage) Cart Path Construction 1. Removal of existing cart path asphalt material (Hole 10 tee)/ sawcut as market in field 2. Remove all asphalt/curbing material off site 3. Installation of new cart path subbase per project specifications 4. Installation of new asphalt cart path per project specifications 5. Installation of new monolithic pour asphalt cart path per project specifications Tee Construction 1. Stripping and disposal of all sod within delineated work areas 2. Removal and Stockpiling all interior tee mix material for future use in tee surrounds areas 3. Removal and disposal of all interior tee drainage 4. Stripping and stockpiling of all available topsoil (where work is limited existing topsoil may remain in place and be reworked) 5. Construction/Shaping of new tee complex including all core elevations and surrounds tie ins per sketches and/or field directives 6. Installation of all interior tee and exterior surrounds drainage 7. Installation of all interior specified tee rootzone (laser level) 8. Installation of new tee/tee surrounds irrigation 9. Finishing all areas to be sodded withing tee surrounds and rough areas 10. Sodding tee surface with specified blend 11. Installation of Specified Sod on all disturbed areas Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Chief Procurement Officer, at purchasing@newtonma.gov. The Foundation will answer such requests only if received by 12:00 noon on Friday, August 15, 2025.
Final Planning
Golf Course
$290,620.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
March 10, 2026
212 Kendrick St, Needham, MA
Related To This Project
Needham, MA
Bid Date: Sep 04 2025
Needham, MA
Bid Date: Sep 05 2025
Needham, MA
Bid Date: Sep 11 2025
Needham, MA
--
Needham, MA
--
Needham, MA
Bid Date: Oct 30 2025
Needham, MA
Bid Date: Nov 13 2025
Needham, MA
Bid Date: Sep 09 2025
Needham, MA
Bid Date: Jul 24 2025
Needham, MA
--
Needham, MA
Bid Date: Jul 02 2025
Needham, MA
Bid Date: Jul 29 2025
Needham, MA
Bid Date: Apr 08 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
