Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2025 at 7:00 PM
Updated December 13, 2025
This is a service / maintenance or supply contract in Corner Brook, Newfoundland. Contact the soliciting agency for additional information.
Closing Time: 3:00 PM (NT) ** Please note that there has been 3 addendum issued for this tender. ** Question Acceptance Deadline 2025/08/18 03:00:00 PM NDT 1. Work under the lump sum portion of each contract shall include labour and material required to perform scheduled inspection and testing of equipment covered by the contract. This shall include all sprinklers, standpipes and fire pump systems in the buildings. The work shall be confined to that requiring the services of an agency authorized by permit from the authority having jurisdiction. 2. Except as otherwise instructed, the Contactor shall supply and pay for all labour, materials, test instruments, tools, accessories, and consumables for the performance of inspection and testing of all sprinklers, standpipes and fire pump systems in the buildings. 3. Without restricting any of the clauses (a) through (e) below, the lump sum component of this contact ius to include all testing and inspections of the above-described systems and associated components, in accordance with NFPA (National Fire Protection Association) 25, "Inspection, Testing, and maintenance of Water Based Fire Protection Systems", latest edition. Illustrative examples of the work to be performed by the Contractor under the lump sum portion of this contact, include but are not limited to the following: a) Inspect and test the sprinkler systems, standpipe systems and fire pump systems of the buildings covered under this contract and undertake recommended corrective action of defective, deficient parts or components or items failing to pass inspection as per NFPA 25.. b) Provide and replace, when necessary, renewable rubber gaskets, rubber clapper facings, and renewable valve discs for control valves. Perform field service adjustments for all control and alarm devices associated directly with the sprinkler system. c) A report detailing each inspection shall be prepared as per NFPA 25 and similar to the sample reports contained therein. The report shall include record of work done, results obtained and any observations or recommendations. Report to be submitted to the Director or their designated representative. d) The Standard Report of Inspection contained in the NFPA 25 (or latest Edition) is to be followed in conjunction with the manufacturer's recommendation for testing and servicing the sprinkler systems. Two copies of this report must be forward to the Director or designate of the Area in which the work is being performed within 48 hours of each inspection. A copy of this report is also to be sent to the authority having jurisdiction. e) Report immediately following the inspection, all conditions requiring immediate repair or attention noted to the Director or their designated representative. f) Each year of the Contact, the Contractor will be required to co-ordinate one of their quarterly inspections with the Fire Alarm Contractor's annual inspections so that both parties are on complete simultaneous system checks as per their respective contacts. The Director's Representative will co-ordinate this requirement. (Required annually by CAN/ULC S536-97. Standard for Inspections and Testing of Fire Alarm Systems.) Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Fire / Police
$108,860.00
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
October 1, 2025
Multiple Locations, Corner Brook, NL
Related To This Project
Corner Brook, NL
Bid Date: Aug 27 2025
Corner Brook, NL
Bid Date: Aug 25 2025
Corner Brook, NL
--
Corner Brook, NL
Bid Date: Sep 04 2025
Corner Brook, NL
Bid Date: Sep 24 2025
Corner Brook, NL
Bid Date: Sep 18 2025
Corner Brook, NL
Bid Date: Sep 22 2025
Corner Brook, NL
Bid Date: Nov 06 2025
Corner Brook, NL
Bid Date: Aug 07 2025
Corner Brook, NL
Bid Date: Jul 18 2025
Corner Brook, NL
Bid Date: Jul 25 2025
Corner Brook, NL
Bid Date: Sep 10 2025
Corner Brook, NL
Bid Date: Jul 10 2025
Corner Brook, NL
Bid Date: Jun 23 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
