BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

This is a service / maintenance or supply contract in Corner Brook, Newfoundland. Contact the soliciting agency for additional information.

Closing Time: 3:00 PM (NT) ** Please note that there has been 3 addendum issued for this tender. ** Question Acceptance Deadline 2025/08/18 03:00:00 PM NDT 1. Work under the lump sum portion of each contract shall include labour and material required to perform scheduled inspection and testing of equipment covered by the contract. This shall include all sprinklers, standpipes and fire pump systems in the buildings. The work shall be confined to that requiring the services of an agency authorized by permit from the authority having jurisdiction. 2. Except as otherwise instructed, the Contactor shall supply and pay for all labour, materials, test instruments, tools, accessories, and consumables for the performance of inspection and testing of all sprinklers, standpipes and fire pump systems in the buildings. 3. Without restricting any of the clauses (a) through (e) below, the lump sum component of this contact ius to include all testing and inspections of the above-described systems and associated components, in accordance with NFPA (National Fire Protection Association) 25, "Inspection, Testing, and maintenance of Water Based Fire Protection Systems", latest edition. Illustrative examples of the work to be performed by the Contractor under the lump sum portion of this contact, include but are not limited to the following: a) Inspect and test the sprinkler systems, standpipe systems and fire pump systems of the buildings covered under this contract and undertake recommended corrective action of defective, deficient parts or components or items failing to pass inspection as per NFPA 25.. b) Provide and replace, when necessary, renewable rubber gaskets, rubber clapper facings, and renewable valve discs for control valves. Perform field service adjustments for all control and alarm devices associated directly with the sprinkler system. c) A report detailing each inspection shall be prepared as per NFPA 25 and similar to the sample reports contained therein. The report shall include record of work done, results obtained and any observations or recommendations. Report to be submitted to the Director or their designated representative. d) The Standard Report of Inspection contained in the NFPA 25 (or latest Edition) is to be followed in conjunction with the manufacturer's recommendation for testing and servicing the sprinkler systems. Two copies of this report must be forward to the Director or designate of the Area in which the work is being performed within 48 hours of each inspection. A copy of this report is also to be sent to the authority having jurisdiction. e) Report immediately following the inspection, all conditions requiring immediate repair or attention noted to the Director or their designated representative. f) Each year of the Contact, the Contractor will be required to co-ordinate one of their quarterly inspections with the Fire Alarm Contractor's annual inspections so that both parties are on complete simultaneous system checks as per their respective contacts. The Director's Representative will co-ordinate this requirement. (Required annually by CAN/ULC S536-97. Standard for Inspections and Testing of Fire Alarm Systems.) Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Fire / Police

$108,860.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
6
Bidding Soon
40
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

October 1, 2025

Project location map

Multiple Locations, Corner Brook, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.