Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 16, 2025 at 8:00 PM
Updated October 30, 2025
Demolition, site work and new construction of a mixed-use development in Fontana, California. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; for site work for a fire / police facility; power facility; power facility; and power facility.
**As of October 16th, 2025, the project was awarded to UltraSystems Environmental Inc, but the awarded amount is not available.** In general, the Project will consist of the demolition of existing 700 SF building within the project limits and the construction of a Police Substation for the City of Fontanas Metrolink Transit Center. Start/Delivery Date October 2025 Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 08/28/2025 2:00 PM (PDT) Questions and comments regarding this solicitation must be submitted online using the citys bid system and click the Q & A tab of the bid . City reserves the right to reject any or all proposals and to waive any informality or irregularity in any proposal. PROJECT DESCRIPTION: The City of Fontana is accepting proposals from qualified firms to provide Environmental Services for the Metrolink Emergency Responder Substation Project. All work associated with this project shall conform to Local, Regional, State and Federal requirements. The proposed Project is located within the Metrolink Transit Center at 16855 Orange Way, Fontana, CA 92335 as shown in the Vicinity Map (Reference Exhibit A Vicinity Map). In general, the Project will consist of the demolition of existing 700 SF building within the project limits and the construction of a Police Substation for the City of Fontanas Metrolink Transit Center. The total substation area shall not exceed 2,800 square feet and improvements shall include the addition of meeting spaces, reception desks for police offices, temporary holding cells, interview rooms, updated restrooms, a small cafe able to station at least two individuals, controlled / secured access, including any required supporting electrical, plumbing, and HVAC improvements
Award
Power Plant
$400,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 27, 2025
16855 Orange Way, Fontana, CA
Related To This Project
Fontana, CA
Bid Date: Aug 21 2025
Fontana, CA
Bid Date: Sep 23 2025
Fontana, CA
--
Fontana, CA
Bid Date: Oct 06 2025
Fontana, CA
Bid Date: Sep 30 2025
Fontana, CA
--
Fontana, CA
--
Fontana, CA
Bid Date: Aug 28 2025
Fontana, CA
Bid Date: Aug 07 2025
Fontana, CA
Bid Date: Sep 02 2025
Fontana, CA
Bid Date: Jul 22 2025
Fontana, CA
--
Fontana, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
