Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 16, 2025 at 8:00 PM
Updated October 30, 2025
Demolition, site work and new construction of a mixed-use development in Fontana, California. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; for site work for a fire / police facility; power facility; power facility; and power facility.
**As of October 16th, 2025, the project was awarded to UltraSystems Environmental Inc, but the awarded amount is not available.** In general, the Project will consist of the demolition of existing 700 SF building within the project limits and the construction of a Police Substation for the City of Fontanas Metrolink Transit Center. Start/Delivery Date October 2025 Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A Yes Q&A Deadline 08/28/2025 2:00 PM (PDT) Questions and comments regarding this solicitation must be submitted online using the citys bid system and click the Q & A tab of the bid . City reserves the right to reject any or all proposals and to waive any informality or irregularity in any proposal. PROJECT DESCRIPTION: The City of Fontana is accepting proposals from qualified firms to provide Environmental Services for the Metrolink Emergency Responder Substation Project. All work associated with this project shall conform to Local, Regional, State and Federal requirements. The proposed Project is located within the Metrolink Transit Center at 16855 Orange Way, Fontana, CA 92335 as shown in the Vicinity Map (Reference Exhibit A Vicinity Map). In general, the Project will consist of the demolition of existing 700 SF building within the project limits and the construction of a Police Substation for the City of Fontanas Metrolink Transit Center. The total substation area shall not exceed 2,800 square feet and improvements shall include the addition of meeting spaces, reception desks for police offices, temporary holding cells, interview rooms, updated restrooms, a small cafe able to station at least two individuals, controlled / secured access, including any required supporting electrical, plumbing, and HVAC improvements
Award
Power Plant
$400,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 4, 2025
October 27, 2025
16855 Orange Way, Fontana, CA
Related To This Project
Fontana, CA
Bid Date: Aug 21 2025
Fontana, CA
Bid Date: Sep 23 2025
Fontana, CA
--
Fontana, CA
Bid Date: Sep 30 2025
Fontana, CA
--
Fontana, CA
--
Fontana, CA
--
Fontana, CA
Bid Date: Aug 28 2025
Fontana, CA
Bid Date: Aug 07 2025
Fontana, CA
Bid Date: Sep 02 2025
Fontana, CA
Bid Date: Jul 22 2025
Fontana, CA
--
Fontana, CA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed