Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated August 12, 2025
Site work and paving for a mixed-use development in Eglin, Florida. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.
Reference Number 0000394920 Question Deadline 08/18/2025 at 4:00 PM CT Questions are submitted online Yes The Okaloosa County Board of County Commissioners is soliciting Statements of Qualifications from interested firms detailing past performance, technical and resource qualifications to represent the County and provide Design through Construction Phase Services to expand the RON Parking Apron at the Destin - Ft Walton Beach Airport (VPS). The scope of this project consists of professional architectural and engineering services for design, grant, bid phase services, and construction phase services for the expansion of the RON Parking Apron at the Destin-Fort Walton Beach Airport. The commercial service apron at VPS is located south of the Terminal, surrounding the concourses. The original apron consisted of 61,227 square yards of concrete pavement and was expanded to the west in 2003 with 12,500 square yards of asphalt pavement and concrete hard stands for five additional gates to bring the current total number of gates to 14. An additional 9,200 square yards of concrete pavement was constructed in 2007 as part of the South Apron Expansion. Currently the apron consists of 82,927 square yards of concrete and asphalt pavement, with an average thickness of 12-14" for the parking and maneuvering of commercial aircraft utilizing the terminal for passenger activities. An additional 5,694 square yards of paved shoulders is located around the apron. Due to its configuration and relationship with the terminal, only about a third of the apron area is available for active terminal parking with taxi lanes also incorporated. The pavement area immediately around the Concourse is active terminal gate parking, and ground service vehicle lanes, apron taxi lanes, and in-bound/outbound baggage as well as commercial delivery areas. Beyond the taxi lanes on the east side is a two-position Remain Overnight (RON) parking area for use by diverted aircraft, or other aircraft requiring extended parking such as maintenance delays. The existing RON apron comprises approximately 9,498 square yards of concrete pavement in good condition with fixed ground power units and area lighting. The RON apron expansion would expand the current RON apron to allow for three additional aircraft to be parked, whether awaiting an open gate for arrival or various maintenance issues without tying up a useable gate. In addition to the apron pavement, the project will include rehab of existing ground power service and addition of new permanent GPUs for the added RON spaces, along with area lighting on high-mast poles that remain below the Part 77 surface for Eglin's Runway 12-30. Additional shoulder pavement area for storing GSE and stormwater permitting/modifications will also be involved with the project as the impervious surface is increased. The last project scope component will include a clamshell or similar design prefabricated tent structure or shelter to provide a more suitable area for performing maintenance actions protected from the weather.
Conceptual
Transportation Terminals
$6,988,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2026
1701 FL-85, Eglin, FL
Related To This Project
Eglin, FL
Bid Date: Aug 26 2025
Eglin, FL
Bid Date: Aug 28 2025
Eglin, FL
Bid Date: Sep 03 2025
Eglin, FL
Bid Date: Sep 12 2025
Eglin, FL
Bid Date: Nov 07 2025
Eglin, FL
Bid Date: Nov 05 2025
Eglin, FL
Bid Date: Jan 22 2026
Eglin, FL
Bid Date: Mar 10 2026
Eglin, FL
Bid Date: Jul 22 2025
Eglin, FL
Bid Date: Aug 16 2025
Eglin, FL
Bid Date: Jul 30 2025
Eglin, FL
Bid Date: Jul 08 2025
Eglin, FL
Bid Date: Aug 25 2025
Eglin, FL
Bid Date: Jun 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
