BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2025 at 7:00 PM

Updated November 27, 2025

Site work and new construction of a clubhouse / community center in Albany, Georgia. Completed plans call for the construction of a 19,200-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Question Deadline 08/29/2025 at 2:30 PM ET The Henderson Park Recreation Center building and associated park improvements involves new construction on the site of an existing park.", "Scope of work includes demolition of the existing building and site elements, site work, concrete paving, asphalt paving, site utilities and buildings.", "The recreation center building consists of concrete slab over structural fill with masonry-faced concrete foundation walls to raise the finished floor elevation due to floodplain location (as required per Albany codes), pre-engineered steel framed structure with masonry veneer and metal panel exterior walls, metal roofing, exterior brick veneer, aluminum windows, exterior metal frames,\nand insulated metal doors.", "Interior includes metal frames and doors, painted masonry and gypsum board interior walls, suspended acoustic and drywall ceilings, multiple flooring types (stained concrete, LVT and carpet tile), porcelain tile and base in restrooms, accessories, plumbing, HVAC, electrical, low voltage systems and concessions food service equipment.", "The gymnasium includes a hardwood gym floor surface and open ceiling with exposed ductwork.", "A separate 1,600 GSF restroom and concessions building is masonry construction on\nconcrete slab with metal roof, plumbing, HVAC and electrical, and concessions equipment.", "Exterior improvements include asphalt paved parking lot, concrete sidewalks, playground area, pre-engineered steel structure covered outdoor basketball court, multi-purpose field, stormwater management infrastructure and overall site landscaping. For all work required for construction of Henderson Park Recreation Center in accordance with bid documents, specifications, and all other contract documents contain herein.

Award

Clubhouse / Community Centers

$8,797,845.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
56
Bidding Soon
624
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2025

October 9, 2025

Project location map

701 Willard Ave, Albany, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.