BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Site work for a power facility in Apex, North Carolina. Design plans call for site work for a power facility.

As of October 8, 2025, this project is in the design phase. Construction is expected to begin towards the end of 2026. Project Description The Town of Apex has a need to increase the capacity of its East Williams Lower substation located off of NC Highway 55 near US Highway 1 to accommodate growth in the area. The substation currently consists of a 40 MVA transformer supplying 2 of 4 feeders to an adjacent switchyard via underground conductors from two breakers and 2000A bus system supported by a V type structure. An additional 40MVA transformer has been purchased and is scheduled for delivery in May of 2027. This project is to create construction documents and substation drawings with the necessary changes to accommodate the new transformer and three new exit feeders (refer to the attached exhibit). The project will also include all required modifications to existing protection, controls, and metering systems to support the upgrades. The existing V type support structure will be demolished and replaced with lattice style support structure with the bus work modified/replaced to match other town substation configurations. Exit feeders are to be fed by 600A reclosers (GW Vipers or Eaton Nova TS) through 576 KVA regulators (GE VR 1 or Eaton/Cooper Quickstep). The project may include the design or layout for all or portions of the exit feeders' (circuit) routes. This includes load-based layout of the distribution transformers, highway crossing, and development of tie points and loop schemes for the circuit and between circuits. The project will include two bid alternates: 1. Modify the existing bus work and V structure to interface with the new exit feeders instead of demolishing the existing structure. 2. Include the addition of 6 exit feeders rather than one. Scope of Work The following scope of work is currently envisioned for this project. The intent is to award the entire scope to one qualified firm or team of firms; however, the town reserves the right to contract separately for any portion of the project. All questions related to the RFQ shall be via email to brad.holland@apexnc.org from the identified contact person. The deadline for questions is 4:00 PM on August 15, 2025.

Design

Power Plant

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
141
Bidding Soon
1,662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Highway 55 Near US Highway 1, Apex, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.