BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 22, 2025

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

The Work includes but is not limited to the following: Mechanical Plumbing and HVAC work at various Port-wide sites within the Seattle-Tacoma International Airport, Seaport Properties, and surrounding vicinities. A portion of the Work under this Contract will focus on replacing Owner furnished Pre Conditioned Air (PC Air) systems that service parked aircraft at the Passenger Loading Bridges (PLB's). Additional minor work to relocate potable water cabinets may be required, too. At the time of bid, the Port of Seattle is unable to determine the precise schedule, or amount of work that may be performed under this Contract. The work will be assigned in a written Work Authorization by a POS Construction Manager. The Work. Authorization will address the scope of work., the estimated value of the work, and time of completion. The Work, as directed by the Work Authorization, shall be performed in accordance with industry standards and all applicable federal, state, and local regulations. The Contractor shall furnish all labor, tools, equipment, materials, and incidentals necessary to perform the work as requested by the Port of Seattle via a Work Authorization. All Contractor labor shall be provided as defined by the labor classifications per the Schedule of Unit Prices listed in Document 00 41 00 - Bid Form. The contract will be awarded for an estimated amount not to exceed 1,500,000.00, which excludes Washington State Sales Tax. Performance and Payment bonds will be required with the Contract. Each bond shall be in the full amount of the contract sum. Bid Bond. Each bid must include a bid guarantee in the form of a cashier's check, money order, or surety bid bond, in an amount not less than five percent (5%) of the total bid, made payable to Port of Seattle. A copy of the bid guarantee shall be provided electronically with your bid. The Port of Seattle is an Equal Opportunity Employer and encourages Disadvantaged Business Enterprises, Minority Business Enterprises, Women Business Enterprises and Small Business Enterprises to participate in the competitive bidding process. Any person who believes they have been aggrieved by an unlawful discriminatory practice under Title VI has a right to tile a formal complaint with the Port. Any such complaint must be in writing and filed with the Port's Title VI Coordinator within one hundred, eighty (180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination Complaint Forms may be obtained from the office of the Title VI Coordinator at no cost to the complainant by calling (206) 787-4066 or sending an email to mailbox.t3@port.seattle.org.

Post-Bid

Transportation Terminals

$1,500,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
88
Bidding Soon
1,346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

October 20, 2025

Project location map

To Be Determined, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.