BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, new construction, renovation and addition to a residential development in Chapel Hill, North Carolina. Conceptual plans call for the addition of a residential development; for the demolition of a residential development; for the construction of a residential development; for the renovation of a residential development; and for site work for a residential development.

As of April 20, 2026, designer selection is underway. Demolition is expected to begin in the summer of 2028, and construction is planned to conclude in 2030. Original solicitation is below for reference: Housing Renewal Phase 2 (Parker Teague Redevelopment) To address increasing enrollment and the need to expand existing housing stock, UNC Chapel Hill seeks to redevelop the site of Parker and Teague Residence Halls on the main campus. The current buildings house upperclass students in semi-suites containing four bedrooms sharing a bathroom with no common space within the suite. It is not predetermined if the redevelopment will result in a single, new residence hall or two separate buildings. The new residence hall(s) will accommodate approximately 550 to 600 upperclass residents in single and double rooms (likely in a similar semi-suite configuration as the current buildings) and should include both interior and exterior amenities. A dining facility space is not anticipated to be part of this project, however there may be opportunities for smaller scale shell space for an outside vendor, such as a cafe. The University is currently engaged in the planning and design of several capital projects in close proximity to this site, so the team selected for this project will need to coordinate with the work of those other projects. UNC is seeking qualifications for the lead design firm and subconsultants for the disciplines as shown below. Each submission should include qualifications for no more than a single bullet point on this list. Submissions should indicate if you are submitting as the Lead Design firm. UNC will select the Lead Design firm first. Once the selection is approved by the Board of Trustees, UNC will provide the submissions for other disciplines to the Lead Design firm in order to assemble a design team. UNC intends to review these submissions with the Lead Design firm but will not contract separately for design services; rather, a single, comprehensive design contract will be executed with the lead design firm to include all disciplines required to deliver the project. -Architecture (if a partnership between two firms, please indicate which firm will serve as Architect of Record) -Structural Engineering -Landscape Architecture -Civil and Utility Distribution Engineering -Mechanical, Electrical, Plumbing, Fire Protection Engineering -Cost Estimation The project has received advance planning spending authority. The intent is to engage the selected design team for full design services upon successful completion of the Advance Planning Phase and receipt of additional funding authority, at the university's option. The project schedule is to have the building online and occupiable by June 30th, 2030. The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Residential Subdivision

$100,000,000.00

Public - State/Provincial

Addition, Demolition, New Construction, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
107
Bidding Soon
2,381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2028

Project location map

To Be Determined, Chapel Hill, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.