BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Renovation of a water / sewer project in Lac du Bonnet, Manitoba. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000299819 The Government of Manitoba, as represented by the Minister of Public Service Delivery, Asset Management, seeks to select a qualified Contractor to provide water treatment control services (including all labour, materials, supplies and equipment) for upgrades to the existing R.O. Skid Controls and Plant SCADA System located in the water treatment plant at the Milner Ridge Correctional Centre in the rural municipality of Lac Du Bonnet, Manitoba. The building is in daily use and the contractor shall be required to coordinate the work while allowing for ongoing facility routine. .1 The work involves the supply, installation and commissioning of new controls and software for upgrading the existing Delco Water RO Skid Controls and the Water Treatment Plant SCADA System at the Milner Ridge Correctional Centre, located in the Rural Municipality of Lac du Bonnet, Manitoba. The building is in daily use and the contractor shall be required to co-ordinate his work while allowing for ongoing facility routine. 2The contractor(s) shall provide all labour, materials, supervision, superintendence and associated services whether or not shown or specified in detail, for the completion of the project as described. The work shall include, but is not limited to the following: .1 RO Skid Controls Upgrade: .1Removal of the existing Delco Omron PLC and Red Lion touchscreen HMI. 2Supply and installation of a new Delco OEM Schneider M340 PLC and Red Lion CR3000 touchscreen HMI. 1New PLC to be placed in a new small enclosure (NEMA 4, CSA) above the existing PLC panel due to the limited space available in the existing panel. .3 All required programming and commissioning .4 Update Electrical panel drawings .2 SCADA Upgrade. .1Provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish, calibrate, and place in operation a complete Supervisory Control and Data Acquisition System (SCADA) software upgrade for the Water Plant. The SCADA system upgrade to include, but not limited to the following: .1Supply and installation of new VTScada software complete with the following: .1New small form factor PC c/w 2 x 27" LED Monitors, Keyboard and mouse. 2VTSCADA 5K runtime license .3VTSCADA 5K alarm license .4New SCADA system to be scalable for future remote communication capabilities for monitoring and full operational functionality. Official bid documents must be obtained from www.merx.com Question Deadline 08/19/2025 Attention: Kara Savage, Contract Administrator E-mail: ASDContractServices@gov.mb.ca

Award

Water / Sewer

$176,208.00

Public - State/Provincial

Renovation

6

19

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
2
Bidding Soon
245
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

September 29, 2025

Project location map

To Be Determined, Lac du Bonnet, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.