BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated September 10, 2025

This is a service / maintenance or supply contract in Nottawa, Ontario. Contact the soliciting agency for additional information.

Reference Number cb-244-97856293 a) The contractor must provide all equipment, tools, materials, vehicles, personnel and services to remove solid waste for disposal and recycling at Beaver Creek Institution; 2000 Beaver Creek Drive, Gravenhurst, Ontario. b) The contractor must remove the solid waste and recycling from Beaver Creek and deliver it to facilities approved for the disposal and recycling. The contractor is responsible for any applicable fees related thereto. c) The contractor must provide a ticket showing the date, waste type and weight of each pickup to the site authority. d) The contractor must provide a monthly report detailing the weight and disposal method for all waste streams. e) The contractor must provide and maintain four dedicated containers (as defined below) onsite at Beaver Creek Institution for the collection of solid waste and recycling. f) The contractor must deliver the required containers to Beaver Creek Institution in the area designated by the site authority during the institution’s business hours of 7:00am to 3:00pm. a) The contractor must supply two eight cubic yard waste containers for non-hazardous solid waste. b) The contractor must schedule and deliver these containers to the site upon contract award. c) The contractor must empty the two eight cubic yard containers every Monday, Tuesday, Thursday, and Friday throughout the year. Pickups must take place between 13:00 and 14:30 hours with the exception of the following statutory holidays: o New Years Day o Canada Day o Thanksgiving Monday o Good Friday o August Civic Holiday o Remembrance Day o Easter Monday o Labor Day o Christmas Day o Victoria Day o Truth & Reconciliation Day o Boxing Day 3. Single Stream Comingled Recycling a) The contractor must supply one eight cubic yard container for recyclable plastic, paper, boxboard, glass and metal waste. b) The contractor must schedule and deliver this container to the site upon contract award. c) The contractor must empty the container every second week. d) The contractor must pick up the single stream and commingled recycling during the institution’s business hours of 07:30-14:30, Monday to Friday, with the exception of the statutory holidays listed above. 4. Cardboard Recycling a) The Contractor must supply one forty cubic yard closed container for recyclable cardboard. b) The contractor must schedule and deliver that container to the site upon contract award. c) The contractor must empty the container every second week. CSC may request additional pick ups on an as required basis. The contractor must pickup the recycling within three business days of the date at which CSC requested an additional pick up. d) The contractor must pick up the cardboard recycling during the institution’s business hours of 07:30-14:30, Monday to Friday, with the exception of the statutory holidays listed above. 5. Estimated Annual Usage The following is the estimated annual weight of waste and number of lifts for this requirement. The inclusion of volumetric data in this document does not represent a commitment by Canada that Canada's future usage of the services described will be consistent with this data.: a) Solid waste - two x 8 cubic yard bins, pickup schedule Monday, Tuesday, Thursday and Friday, plus any additional requested pick ups, approximate annual weight is 215 metric tonnes, with approximately 515 lifts per year. b) Cardboard - one x 40 cubic yard bin, pickup schedule every second week, plus any additional requested pick ups, approximate annual weight is 5.3 metric tonnes, with approximately 34 lifts per year. c) Comingled - one x 8 cubic yard bin, pickup schedule every second week, approximate annual weight is 30 metric tonnes, with approximately 25 lifts per year. Period of the Contract: The Work is to be performed during the period of October 21, 2025 to October 20, 2028. The Crown reserves the right to negotiate with suppliers on any procurement.

Post-Bid

Municipal

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
476
Active Projects
277
Bidding Soon
3,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2025

October 1, 2025

Project location map

Multiple Locations, Nottawa, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.