BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work and paving for a road / highway in Altamonte Springs, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of October 2, 2025, the project was awarded to Cathcart, with an awarded amount of $287,874.33** The City of Altamonte Springs desires to secure the services of a State of Florida Licensed General Contractor to perform pavement reconstruction and resurfacing on Little Wekiva Road, addressing damages caused by Hurricane Milton. The impacts from the hurricane resulted in significant damage to the roadway, necessitating immediate repairs to ensure safety, functionality, and longevity of the infrastructure. This scope of work includes full pavement reconstruction at three (3) locations, with sub-base & base materials, and pavement milling and resurfacing at one (1) intersection to restore the roadway to optimal conditions. Each location will require specific measures to ensure minimal disruption to vehicular and pedestrian traffic, school bus traffic, and residents, adherence to safety standards, and compliance with City and State regulations. The project is divided into four specific locations as detailed below and as identified on the plans. Question End Date 8/29/2025 4:30 PM EST Questions or concerns not submitted to the Procurement Manager may not be considered at the Commission meeting. Anticipated Award Date 10/31/2025 EST Bid Bond Amount 5% Performance Bond Amount 100% The City of Altamonte Springs desires to secure the services of a State of Florida Licensed General Contractor to perform pavement reconstruction and resurfacing on Little Wekiva Road, addressing damages caused by Hurricane Milton. The impacts from the hurricane resulted in significant damage to the roadway, necessitating immediate repairs to ensure safety, functionality, and longevity of the infrastructure. This scope of work includes full pavement reconstruction at three (3) locations, with sub-base & base materials, and pavement milling and resurfacing at one (1) intersection to restore the roadway to optimal conditions. Each location will require specific measures to ensure minimal disruption to vehicular and pedestrian traffic, school bustraffic, and residents, adherence to safety standards, and compliance with City and State regulations. The project is divided into four specific locations as detailed below and as identified on the plans. A. Location 1: Between Willowwood Ave and Parkwood Ave - Full Pavement Reconstruction B. Location 2: At the intersection of Parkwood Ave and Little Wekiva Road - Pavement Resurfacing C. Location 3: Between 623 and 628 Little Wekiva Road - Full Pavement Reconstruction D. Location 4: North of the intersection of Little Wekiva Road and Green Briar Blvd - Full Pavement Reconstruction.

Award

Roads / Highways

$287,874.00

Public - City

Paving, Site Work

9

13

4

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
8
Bidding Soon
1,450
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2025

October 10, 2025

Project location map

Multiple Locations, Altamonte Springs, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.