BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2026 at 8:00 PM

Updated August 31, 2026

Renovation of a mixed-use development in Cortez, Colorado. Working plans call for the renovation of a swimming pool.

Reference Number 0000427910 The goal of this project is to have a fully resurfaced, functional, and safe leisure pool and play feature in the Cortez Recreation Center's Natatorium. Please pay attention to this project's primary scope as well as alternative add-ons; the primary scope is guaranteed while the alternative add-ons will be budget-dependent. The primary scope involves the leisure pool resurfacing, perimeter tile removal and replacement, main drain cover replacement, and the removal and installation of a pre-selected play feature. If budget allows, we would prefer the selected contractor also complete the following: competition pool resurfacing, perimeter tile removal and replacement, main drain cover replacement, install a concrete stair system, replace missing acoustic sound baffles and reattach existing sound baffles. Please note that this project follows a comprehensive design recently completed by Schmueser Gordon Meyer, Inc. and Counsilman/ Hunsaker & Associates, Inc., which is attached to this RFP and sets more detailed standards for the "build phase" of this project. Question Acceptance Deadline 07/10/2026 07:00 PM EDT Questions are submitted online No General Requirements - FOB Destination - Insurance Required

Final Planning

Swimming Pools

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
7
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2026

February 25, 2027

Project location map

425 Roger Smith Ave, Cortez, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.