BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work for a water / sewer project in Cortez, Colorado. Working plans call for site work for a water / sewer project.

Reference Number 0000387552 Supply labor and provide all materials and equipment required for the installation of a 3-inch bulk water control valve, an integrated flow meter, and suitable pressure reduction at the current water dock station, which will also feature a new control station capable of managing three distinct control valves of sizes 3/4-inch, 2-inch, and 3-inch. The installation of the control station must encompass all essential components, including plumbing, wiring, power supply, and internet connectivity. The water dock is located at the City Service Center. There are several concerns with the existing water dock at the Service Center. The 3" feeder line is currently non-functional, and the payment processing system is down. Thus, water customers are forced to use cash or check. The City is seeking to return the water dock to full operational capacity and offer credit/debit and online payment options. The City seeks a customer panel that allows customers to choose what size feeder to use (3/4", 2", 3") and what method of payment to use (cash, debit/credit, or account) Question Deadline 06/09/2025 at 3:00 PM MT Questions are submitted online No The process to be used in the selection of the General Contractor is the Competitive Sealed Best Value Bidding method comprised of two steps as described in Section I (H). Buyer Preferences, Guidelines & Requirements General Requirements - FOB Destination - Installation Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The City reserves the right to waive any formality or any informality in the process of awarding a bid. The City reserves the right to accept any bid, in whole or in part, and to reject any or all bids if it be deemed in the best interest of the City to do so.

Final Planning

Water / Sewer

$600,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
7
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

December 5, 2025

Project location map

110 W Progress Cir, Cortez, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.