Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Renovation of a municipal facility in Anthony, New Mexico. Completed plans call for the renovation of a municipal facility.
As of October 01, 2025, project was awarded to IntraWorks, Inc, awarded amount is $131,399.82. As per addendum 2, bid date was extended from 09/02/2025 at 5:00 PM MT to 09/08/2025 at 5:00 PM MT. Gate Replacement Question Deadline 08/26/2025 Bidders may submit questions, request clarification, or request a change to the IFB by submitting a written request to Diana Chairez at dchairez@scrtd.org The request shall specify the provision of the IFB in question, and if a change is requested, an explanation shall be provided. If the requested change is to the Scope of Work, the request must be submitted at least seven (7) business days before the date set for receipt of IFBs South Central Regional Transit District reserves the expressed right to accept or reject any or all proposals. The South-Central Regional Transit District (SCRTD) solicits sealed bids from qualified contractors to furnish and install new electronic access gates at its Anthony and Sunland Park transit facilities. This project is funded through the FY2025 Section 5339 federal grant for facility rehabilitation. Project Locations 1. Anthony Facility - Address: 830 Anthony Drive, Anthony, NM 88021 - Replace existing manual gate with electronic gate - Install a card reader access control system for employee access -Left pedestrian gate section: 6.6 feet - This section can remain as a newly replaced metal pedestrian access door, or it may be fully replaced by the main gate system. SCRTD is open to vendor suggestions regarding the most effective configuration. -Vehicle drive lane opening (main gate area): 25 feet -Right-side fence panel adjacent to guard station: 22.7 feet -Total impacted frontage: approximately 54.3 linear feet 2. Sunland Park Facility - Address: 295 Quinella Road, Sunland Park, NM 88063 - Replace existing manual gate -north door 204" (17ft) and South door 206"(17ft 2 in) - Install a card reader access control system compatible with Anthony's system - Removal and disposal of existing manual gates - Electrical upgrades to support gate operation and access control - Programming and integration of card reader systems - ADA, OSHA, and local code compliance - Coordination with SCRTD to ensure minimal disruption of operations - Provide training, manuals, and warranty documentation Deliverables - Two fully operational electronic gates - Card reader system programmed for SCRTD-issued employee access cards - 3-year minimum warranty. The warranty must include full coverage of parts and labor, with a maximum response time of 72 business hours for service issues. - Technical and maintenance documentation These measurements correspond to the existing conditions as documented onsite and depicted in the attached image. All components, including the new gate, card reader, and associated fencing, shall align with these spatial parameters. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Municipal
$131,400.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2025
September 16, 2025
Multiple Locations, Anthony, NM
Related To This Project
Anthony, NM
Bid Date: Aug 21 2020
Anthony, NM
--
Anthony, NM
Bid Date: Jun 06 2024
Anthony, NM
Bid Date: Jun 06 2024
Anthony, NM
Bid Date: May 28 2024
Anthony, NM
Bid Date: May 23 2024
Anthony, NM
Bid Date: Apr 30 2024
Anthony, NM
Bid Date: Mar 11 2024
Anthony, NM
Bid Date: Nov 16 2023
Anthony, NM
Bid Date: Feb 16 2022
Anthony, NM
Bid Date: Jan 20 2022
Anthony, NM
Bid Date: Feb 15 2022
Anthony, NM
Bid Date: Jan 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
