Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 28, 2025
Site work for a fire / police facility in Burton, Michigan. Completed plans call for site work for a fire / police facility.
Reference Number 0000395513 Fire Station #1 South Apparatus Approach Remove existing approach and install a 50' x 52' concrete pad to be used as an approach area located at 2031 E Bristol Road Burton MI, 48529. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % Question Deadline 08/27/2025 at 3:00 PM ET Questions are submitted online No, A general information is also available at the above address or may obtained by emailing a request to Julie Griffith at j.griffith@burtonmi.gov. All contract work must be completed in its entirety by November 28, 2025. Failure to complete all contract work by November 28, 2025, will result in the Contractor being assessed liquidated damages in accordance with MDOT 2012 Standard Specifications for Construction. The right is reserved by the Owner to waive any informality in bids, to reject any or all bids, or accept any bid or combination of bids, which is considered most favorable to the Owner. The Owner may also adjust any work item quantities without adjustment of the bid unit price. Existing Approach: Remove and dispose of the existing approach concrete. Base/Subgrade: Make repairs as needed to match existing. Compaction may be required Wire Mesh Minimum of 6 gage 6" x 6" wire mesh Concrete Approach Pad: Concrete Mix Design and associated manufacture of concrete shall, modified for the application and constructability (workability) of the concrete. Mixes and manufacture shall be appropriate to minimize the water added after leaving the plant or on-site. Installation of poured concrete shall be continuous. Cold joints are prohibited. Exterior concrete paving and flatwork shall have positive drainage, maximum slope of not more than 2% Concrete compressive strength, at 28 days, shall be 4,000 psi (minimum) Thickness shall be minimum as minimum of 6" in all locations Broom or equivalent non-slip finish as appropriate for the location for walking surface Surface shall be _" to 1" above the adjacent grade to facilitate walk clearing/plowing during winter weather. Jointing: Provide concrete with appropriate control joints no more than 10' x 10' span using a saw cut joint. All forms, steel, reinforcing, decks, etc. shall be free from oils, rust, scale or debris prior to application of concrete. Sealing: New Concrete will be properly sealed.
Award
Fire / Police
$24,044.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2025
September 29, 2025
2031 E Bristol Rd, Burton, MI
Related To This Project
Burton, MI
Bid Date: Sep 09 2025
Burton, MI
Bid Date: Dec 16 2025
Burton, MI
Bid Date: Feb 26 2026
Burton, MI
Bid Date: Feb 23 2026
Burton, MI
Bid Date: Jul 22 2025
Burton, MI
Bid Date: Jul 01 2025
Burton, MI
Bid Date: Jun 24 2025
Burton, MI
Bid Date: Jun 19 2025
Burton, MI
Bid Date: Jun 18 2025
Burton, MI
Bid Date: May 30 2025
Burton, MI
Bid Date: Jun 18 2025
Burton, MI
Bid Date: Jan 07 2026
Burton, MI
--
Burton, MI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
