BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a road / highway in Underwood, Iowa. Completed plans call for site work for a road / highway.

Work on the improvement shall be commenced immediately upon approval of the contract by the Council and be completed as stated below. Project consists of underground electric cable and conduit running from the meter location to a new wastewater treatment plant building, and miscellaneous associated work. This includes a bore under the BNSF railroad. Contractor shall fully complete the project in 345 calendar days (9/30/26) for substantial completion and 360 calendar days (10/15/26) for final completion. Should the contractor fail to complete the work in this timeframe, liquidated damages of $1,000.00 per calendar day will be assessed for work not completed within the designated contract term. Notice to Proceed is anticipated on October 20, 2025. Site Directions: Project is located at 703 Highway Street in the southeast part of Underwood at the city's wastewater treatment lagoon site. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, and in the amount of 10% of the total amount of the bid as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 100% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by City of Underwood, IA and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless City of Underwood, IA from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The guaranteed maintenance period for new paving shall be four years. The City of Underwood, IA does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.

Award

Roads / Highways

$249,900.00

Public - City

Site Work

6

7

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
93
Bidding Soon
818
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

October 20, 2025

Project location map

703 Railroad Hwy St, Underwood, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.