BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Site work and paving for a sidewalk / parking lot in Whitmore Lake, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000395675 Paving of 2 parking lots at Northfield Township Community Center . North Lot (approx. 5600 sq. ft) : o Remove existing geogrid material and salvage as much existing aggregate as possible o Salvage existing parking blocks and replace them once paving is complete o Install new aggregate base material, where necessary, pave the lot with 4" of asphalt, paint pavement markings and delineate ADA spaces South Lot (approx. 5600 sq. ft.): o Remove existing asphalt surface o Supplement base with aggregate as needed o Repair damaged sidewalk and drive approach o Repair damaged sections of curbing and gutter o Address grading/erosion on west end of lot; add curb and dedicated spillway o Repave lot with asphalt, paint pavement markings and delineate ADA spaces The Community Center has two (2) separate parking lots in need of repair; one on the north side of the building and one on the south side of the building. The northern parking lot is constructed with an aggregate stone base held together with a geogrid material to be replaced with asphalt. The southern parking lot is an asphalt lot with curb and gutter extending along its perimeter with the exception of the west end side to be removed and replaced. The Township is looking for three cost estimates: one for paving just the South Lot, one for paving just the North Lot and one for paving both lots at the same time. General Requirements - Insurance Required . If you have any questions regarding this RFP, please direct them to Douglas McDonough, Township Manager, at (734) 449-2880 ext. 122 or via email at mcdonoughd@northfieldmi.gov. Expected Project Dates: If Both Lots are done together October 2025 If Lots are done separately - North Lot October 2025 South Lot Mid-Late Summer 2026 Northfield Township reserves the right to waive, or not waive, informalities or irregularities in terms or conditions of any proposal if determined by the township to be in its best interest.

Under Construction

Sidewalks / Parking Lot

$85,819.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
164
Bidding Soon
2,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2025

September 17, 2025

Project location map

9101 Main St, Whitmore Lake, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.