BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and paving for a road / highway in Southwick, Massachusetts. Working plans call for site work for a road / highway; and for paving for a road / highway.

Bid is cancelled and will be rebid in the very near future. North Lake Avenue Infrastructure Improvements - Phase 1 Question Deadline 08/27/2025 at 4:30 PM ET Requests for such interpretation must be in writing sent by email to dloring@parecorp.com and jgoddard@southwickma.gov and, to be given consideration, must be received by the close of business least seven (7) calendar days prior to the date fixed for the opening of bids Questions concerning this Invitation for Bids and project must be submitted in writing to: David Loring, P.E., Senior Vice President, Pare Corporation, 14 Bobala Road, Suite 2B, Holyoke MA 01040; via mailed letter or email dloring@parecorp.com. Written responses may be mailed, emailed, or faxed to all bidders on record as having received Bid Documents Contractor Qualification The work under North Lake Avenue Infrastructure Improvements Phase 1 consists of the installation of approximately 730 feet of new 8-inch diameter PVC C900 water main, 360 feet of new 1-inch copper pipe residential water service line, curb shut-off valves, two replacement fire hydrants with associated valves and piping, temporary hot mix asphalt (HMA) roadway surface, and other associated work for the length of North Lake Avenue starting from the intersection with Summer Drive and extending south and then westward. 3. The estimated value of the North Lake Avenue Infrastructure Improvements Phase 1 Project contract is $404,000. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Final Planning

Roads / Highways

$404,000.00

Public - City

Paving, Site Work

12

15

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
614
Active Projects
248
Bidding Soon
4,555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2025

April 6, 2026

Project location map

N Lake Ave, Southwick, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.