BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated August 19, 2025

Site work and new construction of a playground / park / athletic field in Pico Rivera, California. Conceptual plans call civil work for a playground / park / athletic field.

A. Task 1-Project Management B. Task 2-Utility Research and Agency Coordination C. Task 3-Preliminarty Engineering 3.2-Records Research and Field Reviews 3.3-Conceptual Plans D. Task 4-Environmental Studies E. Task 5-Final Engineering F. Task 6-Cost Estimates G. Task 7-Specifications H. Task 8-Right of Way Certification I. Task 9-Project Advertisement Services J. Task 10- Construction Support Services K. Task 11-Prepare Record Drawings (As-builts) The City of Pico Rivera (CITY) is publishing this Request for Proposals (RFP) to solicit proposals from qualified firms (Consultant) to provide design engineering services for the Citywide Regional Trail Entrances and City Entry Points Safety Improvements, CIP No. 50117, CRPL-5351(047) (Project). Design engineering services shall include preliminary engineering, conceptual renderings, surveying, preparation of plans, specifications and estimates (PS&E) and construction support services. The CITY has been awarded a federally funded grant through the California Department of Transportation's (Caltrans) Carbon Reduction Program to support the Project. The Project aims to enhance access and connectivity to nearby trails and promote greater public use by installing missing sidewalk segments, including ADA-compliant ramps. At trail entrances, improvements will include new LED/solar lighting, updated signage, removal of dead or dried vegetation, and replacement with drought-tolerant landscaping and shade-providing trees where feasible. Additional features such as irrigation, decomposed granite, and decorative rock boulders will be incorporated to create a more inviting and accessible environment. To further support public transit use, the Project also proposes the installation of anti-litter signage, new trash and recycling bins, and prefabricated shade canopies at nearby bus stops to reduce heat exposure for waiting passengers. Question Deadline 08/28/2025 at 3:00 PM PT Online Q&A Yes The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$177,500.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
273
Bidding Soon
3,805
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

Project location map

Multiple Locations, Pico Rivera, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.